# South Lodge Hotel · Zero Carbon World

Web page: https://ampmap.co.uk/charger/zero-carbon-world-south-lodge-hotel-uk

South Lodge Hotel is an EV charging site in Horsham, West Sussex, run by Zero Carbon World. Its 4 sockets reach up to 13 kW, with NACS at the top speed, and the price is listed as Free for customers.

## Status

We don't have live status for this charger. Check it when you arrive.

## Location

- **Address:** Brighton Road, RH13 6PS
- **Area:** Horsham, West Sussex, United Kingdom
- **Coordinates (latitude, longitude):** 51.01463, -0.26217
- **Getting there:** 2 Tesla Connectors, up to 13kW.Available for customers. Self park. Tesla Customers/members only

## Connectors and prices

| Connector | Power | Sockets | Price per kWh |
| --- | --- | --- | --- |
| NACS | 13 kW | 2 | Not listed |
| Type 2 | 7 kW | 1 | Not listed |
| BS1363 3 Pin 13 Amp | 3 kW | 1 | Not listed |

- **Price:** Free for customers (from Open Charge Map)

## Site information

- **Operator:** Zero Carbon World
- **Opening hours:** Not published
- **Access:** Public

## Common questions

### How much does it cost to charge at South Lodge Hotel (Zero Carbon World)?

The listed price is Free for customers. Prices can change, so check the price at the charger before you start.

### How fast is charging at South Lodge Hotel (Zero Carbon World)?

Up to 13 kW AC via Type 2, BS1363 3 Pin 13 Amp, NACS.

### How many charging sockets does South Lodge Hotel (Zero Carbon World) have?

4 charging sockets: 1 × 7 kW Type 2, 1 × 3 kW BS1363 3 Pin 13 Amp, 2 × 13 kW NACS.

### Who operates South Lodge Hotel?

South Lodge Hotel is on the Zero Carbon World network. For site issues, the operator lists 01403 891711.

### How long does a Tesla Model Y Long Range take to charge at South Lodge Hotel (Zero Carbon World)?

A 10–80% charge takes about 7h 54m on the 7 kW Type 2 here, adding roughly 55 kWh. Estimates assume a typical charge curve and a warm battery.

### How long does a Tesla Model 3 Rear-Wheel Drive take to charge at South Lodge Hotel (Zero Carbon World)?

A 10–80% charge takes about 5h 42m on the 7 kW Type 2 here, adding roughly 40 kWh. Estimates assume a typical charge curve and a warm battery.

### How long does an Audi Q4 e-tron 50 take to charge at South Lodge Hotel (Zero Carbon World)?

A 10–80% charge takes about 7h 18m on the 7 kW Type 2 here, adding roughly 51 kWh. Estimates assume a typical charge curve and a warm battery.

## Explore the area

- [More chargers in Horsham](https://ampmap.co.uk/chargers/united-kingdom/west-sussex/horsham)
- [Zero Carbon World chargers](https://ampmap.co.uk/networks/zero-carbon-world)

## Chargers near this site

- [Rawowned South Lodge 2 · ChargePoint](https://ampmap.co.uk/charger/chargepoint-rawowned-south-lodge-2-uk) - Type 2 22 kW · South Lodge Hotel Brighton Road
- [Pod Point Bookers Vineyard Ltd](https://ampmap.co.uk/charger/pod-point-bookers-vineyard-ltd-uk) - Type 2 7 kW · MPI Holdings Ltd Bookers Vineyard Foxhole Lan · From 34.8p/kWh
- [Pod Point BEC - Bolney Wine Estate](https://ampmap.co.uk/charger/pod-point-bec-bolney-wine-estate-uk) - Type 2 7 kW · Foxhole Lane · From 33.6p/kWh
- [MFG BP Handcross (S) · GeniePoint](https://ampmap.co.uk/charger/the-geniepoint-network-mfg-bp-handcross-s-uk) - CCS 50 kW, CHAdeMO 50 kW · A23 Southbound
- [Shell Recharge Shell Little Waitrose - Hickstead](https://ampmap.co.uk/charger/shell-recharge-shell-little-waitrose-hickstead-uk) - CCS 175 kW, CHAdeMO 70 kW · A23 Jobs Lane · From 89p/kWh

## Links

- [This charger as JSON, with live socket status](https://ampmap.co.uk/api/chargers/zero-carbon-world-south-lodge-hotel-uk)
- [Use Amp Map in an AI assistant](https://ampmap.co.uk/assistants)

---

Data: Open Charge Map (verified 16 May 2019).

Third-party data from Open Charge Map contributors. It may be out of date or inaccurate - check with the operator before relying on it.

Always check directly with the charge point operator for the most up-to-date information.
