Zero Carbon World · EV charging site
The Five Bells
Southwold Road, Lowestoft, NR34 7JD
The Five Bells is an EV charging site in Lowestoft, Suffolk, run by Zero Carbon World. It has a single 7 kW Type 2 socket, and the price is listed as Free to customers of The Five Bells. No other charging site is listed within a mile, and the nearest site with 50 kW or more is Lowestoft, Tower Retail Park (Source EV), 5 miles away.
Status
No live status
We don't have live status for this charger. Check it when you arrive.
Connectors
Site information
- Operator
- Zero Carbon World
- Opening hours
- Not published
- Access
- Customers only
- Price
- Free to customers of The Five Bells(from Open Charge Map, 2 May 2019)
- Phone (from Open Charge Map)
- 01502 675249
- Getting there
- In car park of The Five Bells. Pub owned by Adnams plc. For use by guests of The Five Bells
- Find it
- Street View of this spot ↗
Always check directly with the charge point operator for the most up-to-date information.
Reviews
No reviews yet. Be the first to rate this charger.
Common questions
How much does it cost to charge at The Five Bells (Zero Carbon World)?
The listed price is Free to customers of The Five Bells. Prices can change, so check the price at the charger before you start.
How fast is charging at The Five Bells (Zero Carbon World)?
Up to 7 kW AC via Type 2.
How many charging sockets does The Five Bells (Zero Carbon World) have?
1 charging socket: 1 × 7 kW Type 2.
Who operates The Five Bells?
The Five Bells is on the Zero Carbon World network. For site issues, the operator lists 01502 675249.
Can anyone charge at The Five Bells (Zero Carbon World)?
The operator lists this charger for customers of the site.
Where is the nearest charger with 50 kW or more to The Five Bells (Zero Carbon World)?
Lowestoft, Tower Retail Park (Source EV) is 5 miles away in a straight line, with up to 160 kW. Check its live status before you set off.
How long does a Tesla Model Y Long Range take to charge at The Five Bells (Zero Carbon World)?
A 10–80% charge takes about 7h 54m on the 7 kW Type 2 here, adding roughly 55 kWh. Estimates assume a typical charge curve and a warm battery.
How long does a Tesla Model 3 Rear-Wheel Drive take to charge at The Five Bells (Zero Carbon World)?
A 10–80% charge takes about 5h 42m on the 7 kW Type 2 here, adding roughly 40 kWh. Estimates assume a typical charge curve and a warm battery.
How long does an Audi Q4 e-tron 50 take to charge at The Five Bells (Zero Carbon World)?
A 10–80% charge takes about 7h 18m on the 7 kW Type 2 here, adding roughly 51 kWh. Estimates assume a typical charge curve and a warm battery.