# The Five Bells · Zero Carbon World

Web page: https://ampmap.co.uk/charger/zero-carbon-world-the-five-bells-uk

The Five Bells is an EV charging site in Lowestoft, Suffolk, run by Zero Carbon World. It has a single 7 kW Type 2 socket, and the price is listed as Free to customers of The Five Bells.

## Status

We don't have live status for this charger. Check it when you arrive.

## Location

- **Address:** Southwold Road, NR34 7JD
- **Area:** Lowestoft, Suffolk, United Kingdom
- **Coordinates (latitude, longitude):** 52.37796, 1.67075
- **Getting there:** In car park of The Five Bells. Pub owned by Adnams plc. For use by guests of The Five Bells

## Connectors and prices

| Connector | Power | Sockets | Price per kWh |
| --- | --- | --- | --- |
| Type 2 | 7 kW | 1 | Not listed |

- **Price:** Free to customers of The Five Bells (from Open Charge Map)

## Site information

- **Operator:** Zero Carbon World
- **Opening hours:** Not published
- **Access:** Customers only

## Common questions

### How much does it cost to charge at The Five Bells (Zero Carbon World)?

The listed price is Free to customers of The Five Bells. Prices can change, so check the price at the charger before you start.

### How fast is charging at The Five Bells (Zero Carbon World)?

Up to 7 kW AC via Type 2.

### How many charging sockets does The Five Bells (Zero Carbon World) have?

1 charging socket: 1 × 7 kW Type 2.

### Who operates The Five Bells?

The Five Bells is on the Zero Carbon World network. For site issues, the operator lists 01502 675249.

### Can anyone charge at The Five Bells (Zero Carbon World)?

The operator lists this charger for customers of the site.

### How long does a Tesla Model Y Long Range take to charge at The Five Bells (Zero Carbon World)?

A 10–80% charge takes about 7h 54m on the 7 kW Type 2 here, adding roughly 55 kWh. Estimates assume a typical charge curve and a warm battery.

### How long does a Tesla Model 3 Rear-Wheel Drive take to charge at The Five Bells (Zero Carbon World)?

A 10–80% charge takes about 5h 42m on the 7 kW Type 2 here, adding roughly 40 kWh. Estimates assume a typical charge curve and a warm battery.

### How long does an Audi Q4 e-tron 50 take to charge at The Five Bells (Zero Carbon World)?

A 10–80% charge takes about 7h 18m on the 7 kW Type 2 here, adding roughly 51 kWh. Estimates assume a typical charge curve and a warm battery.

## Explore the area

- [More chargers in Lowestoft](https://ampmap.co.uk/chargers/united-kingdom/suffolk/lowestoft)
- [Zero Carbon World chargers](https://ampmap.co.uk/networks/zero-carbon-world)

## Chargers near this site

- [The Plough Inn · Zero Carbon World](https://ampmap.co.uk/charger/zero-carbon-world-the-plough-inn-uk) - Type 2 7 kW · London Road
- [PIS Reydon VH · ElectRoad](https://ampmap.co.uk/charger/electroad-pis-reydon-vh-uk) - Type 2 7 kW · Reydon Village Hall

## Links

- [This charger as JSON, with live socket status](https://ampmap.co.uk/api/chargers/zero-carbon-world-the-five-bells-uk)
- [Use Amp Map in an AI assistant](https://ampmap.co.uk/assistants)

---

Data: Open Charge Map (verified 2 May 2019).

Third-party data from Open Charge Map contributors. It may be out of date or inaccurate - check with the operator before relying on it.

Always check directly with the charge point operator for the most up-to-date information.