Zero Carbon World · EV charging site
The George Inn
Church Street, Mendip, BS28 4AB
The George Inn is an EV charging site in Mendip, Somerset, run by Zero Carbon World. Its 2 sockets reach up to 7 kW, with Type 2 at the top speed. No other charging site is listed within a mile, and the nearest site with 50 kW or more is EH - Roadchef Sedgemoor Southbound (GRIDSERVE), 5.5 miles away.
Status
No live status
We don't have live status for this charger. Check it when you arrive.
Connectors
Site information
- Operator
- Zero Carbon World
- Opening hours
- Not published
- Access
- Public
- Phone (from Open Charge Map)
- 01934 712124
- Find it
- Street View of this spot ↗
Facilities
Always check directly with the charge point operator for the most up-to-date information.
Reviews
No reviews yet. Be the first to rate this charger.
Common questions
How fast is charging at The George Inn (Zero Carbon World)?
Up to 7 kW AC via BS1363 3 Pin 13 Amp, Type 2.
How many charging sockets does The George Inn (Zero Carbon World) have?
2 charging sockets: 1 × 3 kW BS1363 3 Pin 13 Amp, 1 × 7 kW Type 2.
Who operates The George Inn?
The George Inn is on the Zero Carbon World network. For site issues, the operator lists 01934 712124.
Where is the nearest charger with 50 kW or more to The George Inn (Zero Carbon World)?
EH - Roadchef Sedgemoor Southbound (GRIDSERVE) is 5.5 miles away in a straight line, with up to 50 kW. Check its live status before you set off.
How long does a Tesla Model Y Long Range take to charge at The George Inn (Zero Carbon World)?
A 10–80% charge takes about 7h 54m on the 7 kW Type 2 here, adding roughly 55 kWh. Estimates assume a typical charge curve and a warm battery.
How long does a Tesla Model 3 Rear-Wheel Drive take to charge at The George Inn (Zero Carbon World)?
A 10–80% charge takes about 5h 42m on the 7 kW Type 2 here, adding roughly 40 kWh. Estimates assume a typical charge curve and a warm battery.
How long does an Audi Q4 e-tron 50 take to charge at The George Inn (Zero Carbon World)?
A 10–80% charge takes about 7h 18m on the 7 kW Type 2 here, adding roughly 51 kWh. Estimates assume a typical charge curve and a warm battery.