Zero Carbon World · EV charging site
The Grange at Oborne
Oborne, Yeovil, DT9 4LA
The Grange at Oborne is an EV charging site in Yeovil, Somerset, run by Zero Carbon World. It has a single 22 kW Type 2 socket, and the price is listed as Free for guests. No other charging site is listed within a mile, and the nearest site with 50 kW or more is Coldharbour Car Park (Be.EV), 1.4 miles away.
Status
No live status
We don't have live status for this charger. Check it when you arrive.
Connectors
Site information
- Operator
- Zero Carbon World
- Opening hours
- Not published
- Access
- Public
- Price
- Free for guests(from Open Charge Map, 29 Jul 2019)
- Phone (from Open Charge Map)
- 01935 813463
- Find it
- Street View of this spot ↗
Always check directly with the charge point operator for the most up-to-date information.
Reviews
No reviews yet. Be the first to rate this charger.
Common questions
How much does it cost to charge at The Grange at Oborne (Zero Carbon World)?
The listed price is Free for guests. Prices can change, so check the price at the charger before you start.
How fast is charging at The Grange at Oborne (Zero Carbon World)?
Up to 22 kW AC via Type 2.
How many charging sockets does The Grange at Oborne (Zero Carbon World) have?
1 charging socket: 1 × 22 kW Type 2.
Who operates The Grange at Oborne?
The Grange at Oborne is on the Zero Carbon World network. For site issues, the operator lists 01935 813463.
Where is the nearest charger with 50 kW or more to The Grange at Oborne (Zero Carbon World)?
Coldharbour Car Park (Be.EV) is 1.4 miles away in a straight line, with up to 60 kW. Check its live status before you set off.
How long does a Tesla Model Y Long Range take to charge at The Grange at Oborne (Zero Carbon World)?
A 10–80% charge takes about 5h 2m on the 22 kW Type 2 here, adding roughly 55 kWh. Estimates assume a typical charge curve and a warm battery.
How long does a Tesla Model 3 Rear-Wheel Drive take to charge at The Grange at Oborne (Zero Carbon World)?
A 10–80% charge takes about 3h 38m on the 22 kW Type 2 here, adding roughly 40 kWh. Estimates assume a typical charge curve and a warm battery.
How long does an Audi Q4 e-tron 50 take to charge at The Grange at Oborne (Zero Carbon World)?
A 10–80% charge takes about 4h 39m on the 22 kW Type 2 here, adding roughly 51 kWh. Estimates assume a typical charge curve and a warm battery.
Chargers near this site
- Coldharbour Car Park
- Old Market Yard Car Park
- 26 East Street Plug-N-Go
- Culverhayes Car Park
- Culverhayes Long Stay Car Park
- Bradfords Sherborne 01
- Cheapest nearby
- Old Market Yard Car Park · 59p per kWh · 50 kW · 1.5 mi
- Fastest nearby
- Coldharbour Car Park · 60 kW · 1.4 mi