Amp Map is in beta - data and features are still being developed. Any feedback is appreciated.Amp Map is in beta. Send feedback

Zero Carbon World · EV charging site

The Green House

4 Grove Road, Bournemouth, BH1 3AX

The Green House is an EV charging site in Bournemouth, Bournemouth, Christchurch and Poole Council, run by Zero Carbon World. Its 2 sockets reach up to 11 kW, with NACS at the top speed. 16 other charging sites are listed within a mile, and the nearest site with 50 kW or more is Glen Fern Car Park (Be.EV), 0.3 miles away.

Status

No live status

We don't have live status for this charger. Check it when you arrive.

Community dataThird-party data from Open Charge Map contributors. It may be out of date or inaccurate - check with the operator before relying on it.Last verified 23 Apr 2019Last verified 23 Apr 2019

Connectors

NACS · 11 kW1 connector
Type 2 · 7 kW1 connector

Site information

Opening hours
Not published
Access
Public
Phone (from Open Charge Map)
01202 498900

Always check directly with the charge point operator for the most up-to-date information.

Charge times by car

Charge window10–80%
Tesla Model Y Long Range 10–80% · 7 kW Type 2~7h 54m
Tesla Model 3 Rear-Wheel Drive 10–80% · 7 kW Type 2~5h 42m
Audi Q4 e-tron 50 10–80% · 7 kW Type 2~7h 18m
Hyundai IONIQ 5 10–80% · 7 kW Type 2~7h 16m
MG Motor MG4 Trophy 10–80% · 7 kW Type 2~6h 6m
Hyundai Kona Electric Long Range 10–80% · 7 kW Type 2~5h 48m
Nissan LEAF 10–80% · 7 kW Type 2~4h 15m

Estimates assume a typical charge curve and a warm battery.

Reviews

No reviews yet. Be the first to rate this charger.

Rate this charger

Common questions

How fast is charging at The Green House (Zero Carbon World)?

Up to 11 kW AC via Type 2, NACS.

How many charging sockets does The Green House (Zero Carbon World) have?

2 charging sockets: 1 × 7 kW Type 2, 1 × 11 kW NACS.

Who operates The Green House?

The Green House is on the Zero Carbon World network. For site issues, the operator lists 01202 498900.

Where is the nearest charger with 50 kW or more to The Green House (Zero Carbon World)?

Glen Fern Car Park (Be.EV) is 0.3 miles away in a straight line, with up to 50 kW. Check its live status before you set off.

How long does a Tesla Model Y Long Range take to charge at The Green House (Zero Carbon World)?

A 10–80% charge takes about 7h 54m on the 7 kW Type 2 here, adding roughly 55 kWh. Estimates assume a typical charge curve and a warm battery.

How long does a Tesla Model 3 Rear-Wheel Drive take to charge at The Green House (Zero Carbon World)?

A 10–80% charge takes about 5h 42m on the 7 kW Type 2 here, adding roughly 40 kWh. Estimates assume a typical charge curve and a warm battery.

How long does an Audi Q4 e-tron 50 take to charge at The Green House (Zero Carbon World)?

A 10–80% charge takes about 7h 18m on the 7 kW Type 2 here, adding roughly 51 kWh. Estimates assume a typical charge curve and a warm battery.

Data: Open Charge Map · verified 23 Apr 2019

Amp Map does not take payment. You pay the operator.