Zero Carbon World · EV charging site
The Izaak Walton Hotel
Dovedale, Leek, DE6 2AY
The Izaak Walton Hotel is an EV charging site in Leek, Staffordshire, run by Zero Carbon World. Its 2 sockets reach up to 7 kW, with Type 2 at the top speed, and the price is listed as Free for customers. 1 other charging site is listed within a mile, and the nearest site with 50 kW or more is Stepping Stones, Ashbourne (Osprey Charging), 3.6 miles away.
Status
Out of service
We don't have live status for this charger. Check it when you arrive.
Connectors
Site information
- Operator
- Zero Carbon World
- Opening hours
- Not published
- Access
- Public
- Price
- Free for customers(from Open Charge Map, 11 Aug 2022)
- Phone (from Open Charge Map)
- 01335 350981
- Find it
- Street View of this spot ↗
Facilities
Always check directly with the charge point operator for the most up-to-date information.
Reviews
No reviews yet. Be the first to rate this charger.
Common questions
How much does it cost to charge at The Izaak Walton Hotel (Zero Carbon World)?
The listed price is Free for customers. Prices can change, so check the price at the charger before you start.
How fast is charging at The Izaak Walton Hotel (Zero Carbon World)?
Up to 7 kW AC via Type 2, BS1363 3 Pin 13 Amp.
How many charging sockets does The Izaak Walton Hotel (Zero Carbon World) have?
2 charging sockets: 1 × 7 kW Type 2, 1 × 3 kW BS1363 3 Pin 13 Amp.
Who operates The Izaak Walton Hotel?
The Izaak Walton Hotel is on the Zero Carbon World network. For site issues, the operator lists 01335 350981.
Where is the nearest charger with 50 kW or more to The Izaak Walton Hotel (Zero Carbon World)?
Stepping Stones, Ashbourne (Osprey Charging) is 3.6 miles away in a straight line, with up to 75 kW. Check its live status before you set off.
How long does a Tesla Model Y Long Range take to charge at The Izaak Walton Hotel (Zero Carbon World)?
A 10–80% charge takes about 7h 54m on the 7 kW Type 2 here, adding roughly 55 kWh. Estimates assume a typical charge curve and a warm battery.
How long does a Tesla Model 3 Rear-Wheel Drive take to charge at The Izaak Walton Hotel (Zero Carbon World)?
A 10–80% charge takes about 5h 42m on the 7 kW Type 2 here, adding roughly 40 kWh. Estimates assume a typical charge curve and a warm battery.
How long does an Audi Q4 e-tron 50 take to charge at The Izaak Walton Hotel (Zero Carbon World)?
A 10–80% charge takes about 7h 18m on the 7 kW Type 2 here, adding roughly 51 kWh. Estimates assume a typical charge curve and a warm battery.
Chargers near this site
- Beechenhill Farm
- The Bentley Brook Inn
- Pod Point Pinelodge Holidays
- Shawcroft Carpark
- Stepping Stones, Ashbourne
- Cheapest nearby
- Pod Point Pinelodge Holidays · 64.8p per kWh · 7 kW · 2.7 mi
- Fastest nearby
- Stepping Stones, Ashbourne · 75 kW · 3.6 mi