Zero Carbon World · EV charging site
The Lakeland Wildlife Oasis
Kendal, LA7 7FE
The Lakeland Wildlife Oasis is an EV charging site in Kendal, Cumbria, run by Zero Carbon World. It has a single 7 kW Type 2 socket. No other charging site is listed within a mile, and the nearest site with 50 kW or more is EH - MOTO Burton-in-Kendal (GRIDSERVE), 1.3 miles away.
Status
No live status
We don't have live status for this charger. Check it when you arrive.
Connectors
Site information
- Operator
- Zero Carbon World
- Opening hours
- Not published
- Access
- Public
- Phone (from Open Charge Map)
- 01539 563027
- Find it
- Street View of this spot ↗
Always check directly with the charge point operator for the most up-to-date information.
Reviews
No reviews yet. Be the first to rate this charger.
Common questions
How fast is charging at The Lakeland Wildlife Oasis (Zero Carbon World)?
Up to 7 kW AC via Type 2.
How many charging sockets does The Lakeland Wildlife Oasis (Zero Carbon World) have?
1 charging socket: 1 × 7 kW Type 2.
Who operates The Lakeland Wildlife Oasis?
The Lakeland Wildlife Oasis is on the Zero Carbon World network. For site issues, the operator lists 01539 563027.
Where is the nearest charger with 50 kW or more to The Lakeland Wildlife Oasis (Zero Carbon World)?
EH - MOTO Burton-in-Kendal (GRIDSERVE) is 1.3 miles away in a straight line, with up to 350 kW. Check its live status before you set off.
How long does a Tesla Model Y Long Range take to charge at The Lakeland Wildlife Oasis (Zero Carbon World)?
A 10–80% charge takes about 7h 54m on the 7 kW Type 2 here, adding roughly 55 kWh. Estimates assume a typical charge curve and a warm battery.
How long does a Tesla Model 3 Rear-Wheel Drive take to charge at The Lakeland Wildlife Oasis (Zero Carbon World)?
A 10–80% charge takes about 5h 42m on the 7 kW Type 2 here, adding roughly 40 kWh. Estimates assume a typical charge curve and a warm battery.
How long does an Audi Q4 e-tron 50 take to charge at The Lakeland Wildlife Oasis (Zero Carbon World)?
A 10–80% charge takes about 7h 18m on the 7 kW Type 2 here, adding roughly 51 kWh. Estimates assume a typical charge curve and a warm battery.
Chargers near this site
- Cheapest nearby
- EH - MOTO Burton-in-Kendal · 59p per kWh · 350 kW · 1.3 mi
- Fastest nearby
- EH - MOTO Burton-in-Kendal · 350 kW · 1.3 mi