# The Old Vicarage · Zero Carbon World

Web page: https://ampmap.co.uk/charger/zero-carbon-world-the-old-vicarage-uk

The Old Vicarage is an EV charging site in Mochdre, Sir Powys, run by Zero Carbon World. It has a single 7 kW Type 2 socket, and the price is listed as 40p/kW.

## Status

We don't have live status for this charger. Check it when you arrive.

## Location

- **Address:** Dolfor, SY16 4BN
- **Area:** Mochdre, Sir Powys, United Kingdom
- **Coordinates (latitude, longitude):** 52.47944, -3.31504

## Connectors and prices

| Connector | Power | Sockets | Price per kWh |
| --- | --- | --- | --- |
| Type 2 | 7 kW | 1 | Not listed |

- **Price:** 40p/kW (from Open Charge Map)

## Site information

- **Operator:** Zero Carbon World
- **Opening hours:** Not published
- **Access:** Customers only
- **Notes:** Payment at reception as part of room charges.

## Common questions

### How much does it cost to charge at The Old Vicarage (Zero Carbon World)?

The listed price is 40p/kW. Prices can change, so check the price at the charger before you start.

### How fast is charging at The Old Vicarage (Zero Carbon World)?

Up to 7 kW AC via Type 2.

### How many charging sockets does The Old Vicarage (Zero Carbon World) have?

1 charging socket: 1 × 7 kW Type 2.

### Who operates The Old Vicarage?

The Old Vicarage is on the Zero Carbon World network. For site issues, the operator lists 07753 760054.

### Can anyone charge at The Old Vicarage (Zero Carbon World)?

The operator lists this charger for customers of the site.

### How long does a Tesla Model Y Long Range take to charge at The Old Vicarage (Zero Carbon World)?

A 10–80% charge takes about 7h 54m on the 7 kW Type 2 here, adding roughly 55 kWh. Estimates assume a typical charge curve and a warm battery.

### How long does a Tesla Model 3 Rear-Wheel Drive take to charge at The Old Vicarage (Zero Carbon World)?

A 10–80% charge takes about 5h 42m on the 7 kW Type 2 here, adding roughly 40 kWh. Estimates assume a typical charge curve and a warm battery.

### How long does an Audi Q4 e-tron 50 take to charge at The Old Vicarage (Zero Carbon World)?

A 10–80% charge takes about 7h 18m on the 7 kW Type 2 here, adding roughly 51 kWh. Estimates assume a typical charge curve and a warm battery.

## Explore the area

- [More chargers in Mochdre](https://ampmap.co.uk/chargers/united-kingdom/sir-powys/mochdre)
- [Zero Carbon World chargers](https://ampmap.co.uk/networks/zero-carbon-world)

## Chargers near this site

- [Pod Point Tesco Superstore - Newtown](https://ampmap.co.uk/charger/pod-point-tesco-superstore-newtown-uk) - CCS / CHAdeMO 50 kW, Type 2 22 kW · Pool Road · From 44.4p/kWh
- [Back Lane Car Park Newtown · Evolt](https://ampmap.co.uk/charger/evolt-network-back-lane-car-park-newtown-uk) - CCS 50 kW, CHAdeMO 50 kW · Back Lane
- [Back Lane Car Park Newtown · Dragon Charging](https://ampmap.co.uk/charger/dragon-charging-back-lane-car-park-newtown-uk) - Type 2 22 kW · Back Lane

## Links

- [This charger as JSON, with live socket status](https://ampmap.co.uk/api/chargers/zero-carbon-world-the-old-vicarage-uk)
- [Use Amp Map in an AI assistant](https://ampmap.co.uk/assistants)

---

Data: Open Charge Map (verified 2 Oct 2022).

Third-party data from Open Charge Map contributors. It may be out of date or inaccurate - check with the operator before relying on it.

Always check directly with the charge point operator for the most up-to-date information.
