Zero Carbon World · EV charging site
The Royal Hotel
1 South Parade, Weston-super-Mare, BS23 1JP
The Royal Hotel is an EV charging site in Weston-super-Mare, North Somerset, run by Zero Carbon World. Its 2 sockets reach up to 7 kW, with Type 2 at the top speed. 3 other charging sites are listed within a mile, and the nearest site with 50 kW or more is Howards Weston Super Mare (Nissan UK Dealer Network), 0.7 miles away.
Status
No live status
We don't have live status for this charger. Check it when you arrive.
Connectors
Site information
- Operator
- Zero Carbon World
- Opening hours
- Not published
- Access
- Public
- Phone (from Open Charge Map)
- 01934 423 100
- Notes
- Pay as you go coin operated system £1 per hour. Check in with reception as if guest/customer of hotel/restaurant parking charges should not apply.
- Find it
- Street View of this spot ↗
Facilities
Always check directly with the charge point operator for the most up-to-date information.
Reviews
No reviews yet. Be the first to rate this charger.
Common questions
How fast is charging at The Royal Hotel (Zero Carbon World)?
Up to 7 kW AC via BS1363 3 Pin 13 Amp, Type 2.
How many charging sockets does The Royal Hotel (Zero Carbon World) have?
2 charging sockets: 1 × 3 kW BS1363 3 Pin 13 Amp, 1 × 7 kW Type 2.
Who operates The Royal Hotel?
The Royal Hotel is on the Zero Carbon World network. For site issues, the operator lists 01934 423 100.
Where is the nearest charger with 50 kW or more to The Royal Hotel (Zero Carbon World)?
Howards Weston Super Mare (Nissan UK Dealer Network) is 0.7 miles away in a straight line, with up to 50 kW. Check its live status before you set off.
How long does a Tesla Model Y Long Range take to charge at The Royal Hotel (Zero Carbon World)?
A 10–80% charge takes about 7h 54m on the 7 kW Type 2 here, adding roughly 55 kWh. Estimates assume a typical charge curve and a warm battery.
How long does a Tesla Model 3 Rear-Wheel Drive take to charge at The Royal Hotel (Zero Carbon World)?
A 10–80% charge takes about 5h 42m on the 7 kW Type 2 here, adding roughly 40 kWh. Estimates assume a typical charge curve and a warm battery.
How long does an Audi Q4 e-tron 50 take to charge at The Royal Hotel (Zero Carbon World)?
A 10–80% charge takes about 7h 18m on the 7 kW Type 2 here, adding roughly 51 kWh. Estimates assume a typical charge curve and a warm battery.
Chargers near this site
- Revive_NSC
- Carlton Street Car Park
- Howards Weston Super Mare
- Weston-Super-Mare, Weston Retail Park
- Howards Toyota
- Tim Hortons
- Cheapest nearby
- Weston-Super-Mare, Weston Retail Park · 90p per kWh · 160 kW · 1.2 mi
- Fastest nearby
- Weston-Super-Mare, Weston Retail Park · 160 kW · 1.2 mi