Zero Carbon World · EV charging site
Tordown B&B and Healing Centre
5 Ashwell Lane, Mendip, BA6 8BG
Tordown B&B and Healing Centre is an EV charging site in Mendip, Somerset, run by Zero Carbon World. Its 2 sockets reach up to 7 kW, with Type 2 at the top speed. 5 other charging sites are listed within a mile, and the nearest site with 50 kW or more is Morrisons Glastonbury (GeniePoint), 1 mile away.
Status
No live status
We don't have live status for this charger. Check it when you arrive.
Connectors
Site information
- Operator
- Zero Carbon World
- Opening hours
- Not published
- Access
- Public
- Phone (from Open Charge Map)
- 01458 832287
- Find it
- Street View of this spot ↗
Always check directly with the charge point operator for the most up-to-date information.
Reviews
No reviews yet. Be the first to rate this charger.
Common questions
How fast is charging at Tordown B&B and Healing Centre (Zero Carbon World)?
Up to 7 kW AC via Type 2, BS1363 3 Pin 13 Amp.
How many charging sockets does Tordown B&B and Healing Centre (Zero Carbon World) have?
2 charging sockets: 1 × 7 kW Type 2, 1 × 3 kW BS1363 3 Pin 13 Amp.
Who operates Tordown B&B and Healing Centre?
Tordown B&B and Healing Centre is on the Zero Carbon World network. For site issues, the operator lists 01458 832287.
Where is the nearest charger with 50 kW or more to Tordown B&B and Healing Centre (Zero Carbon World)?
Morrisons Glastonbury (GeniePoint) is 1 mile away in a straight line, with up to 50 kW. Check its live status before you set off.
How long does a Tesla Model Y Long Range take to charge at Tordown B&B and Healing Centre (Zero Carbon World)?
A 10–80% charge takes about 7h 54m on the 7 kW Type 2 here, adding roughly 55 kWh. Estimates assume a typical charge curve and a warm battery.
How long does a Tesla Model 3 Rear-Wheel Drive take to charge at Tordown B&B and Healing Centre (Zero Carbon World)?
A 10–80% charge takes about 5h 42m on the 7 kW Type 2 here, adding roughly 40 kWh. Estimates assume a typical charge curve and a warm battery.
How long does an Audi Q4 e-tron 50 take to charge at Tordown B&B and Healing Centre (Zero Carbon World)?
A 10–80% charge takes about 7h 18m on the 7 kW Type 2 here, adding roughly 51 kWh. Estimates assume a typical charge curve and a warm battery.
Chargers near this site
- Butt Close Car Park 3
- Glastonbury Town Council St Dunstan's Car Park
- St Johns Car Park 1
- Morrisons Glastonbury
- Northload West Car Park 3
- Pod Point Tesco Superstore - Glastonbury
- Cheapest nearby
- Pod Point Tesco Superstore - Glastonbury · 44.4p per kWh · 7 kW · 1.4 mi
- Fastest nearby
- Morrisons Glastonbury · 50 kW · 1 mi