Zero Carbon World · EV charging site
Tredethick Farm Cottages
Tredethick Farm, Bodmin, PL22 0LE
Tredethick Farm Cottages is an EV charging site in Bodmin, Cornwall, run by Zero Carbon World. It has a single 7 kW Type 2 socket. 2 other charging sites are listed within a mile, and the nearest site with 50 kW or more is Earl of Chatham - Cornwall (GeniePoint), 0.8 miles away.
Status
No live status
We don't have live status for this charger. Check it when you arrive.
Connectors
Site information
- Operator
- Zero Carbon World
- Opening hours
- Not published
- Access
- Public
- Phone (from Open Charge Map)
- 01208 873618
- Notes
- for use by customers/visitors
- Find it
- Street View of this spot ↗
Always check directly with the charge point operator for the most up-to-date information.
Reviews
No reviews yet. Be the first to rate this charger.
Common questions
How fast is charging at Tredethick Farm Cottages (Zero Carbon World)?
Up to 7 kW AC via Type 2.
How many charging sockets does Tredethick Farm Cottages (Zero Carbon World) have?
1 charging socket: 1 × 7 kW Type 2.
Who operates Tredethick Farm Cottages?
Tredethick Farm Cottages is on the Zero Carbon World network. For site issues, the operator lists 01208 873618.
Where is the nearest charger with 50 kW or more to Tredethick Farm Cottages (Zero Carbon World)?
Earl of Chatham - Cornwall (GeniePoint) is 0.8 miles away in a straight line, with up to 50 kW. Check its live status before you set off.
How long does a Tesla Model Y Long Range take to charge at Tredethick Farm Cottages (Zero Carbon World)?
A 10–80% charge takes about 7h 54m on the 7 kW Type 2 here, adding roughly 55 kWh. Estimates assume a typical charge curve and a warm battery.
How long does a Tesla Model 3 Rear-Wheel Drive take to charge at Tredethick Farm Cottages (Zero Carbon World)?
A 10–80% charge takes about 5h 42m on the 7 kW Type 2 here, adding roughly 40 kWh. Estimates assume a typical charge curve and a warm battery.
How long does an Audi Q4 e-tron 50 take to charge at Tredethick Farm Cottages (Zero Carbon World)?
A 10–80% charge takes about 7h 18m on the 7 kW Type 2 here, adding roughly 51 kWh. Estimates assume a typical charge curve and a warm battery.
Chargers near this site
- Earl of Chatham - Cornwall
- Earl of Chatham
- Best Western Fowey Valley
- Boconnoc House & Estate
- Trenython Manor
- Fastest nearby
- Earl of Chatham - Cornwall · 50 kW · 0.8 mi