Zero Carbon World · EV charging site
Units B&C
The Mallards, Cirencester, GL7 5TQ
Units B&C is an EV charging site in Cirencester, Gloucestershire, run by Zero Carbon World. Its 2 sockets reach up to 22 kW, with Type 2 at the top speed. 1 other charging site is listed within a mile, and the nearest site with 50 kW or more is Gateway Information Centre (Be.EV), 1.4 miles away.
Status
No live status
We don't have live status for this charger. Check it when you arrive.
Connectors
Site information
- Operator
- Zero Carbon World
- Opening hours
- Not published
- Access
- Customers only
- Phone (from Open Charge Map)
- 01172307172
- Find it
- Street View of this spot ↗
Always check directly with the charge point operator for the most up-to-date information.
Reviews
No reviews yet. Be the first to rate this charger.
Common questions
How fast is charging at Units B&C (Zero Carbon World)?
Up to 22 kW AC via Type 2.
How many charging sockets does Units B&C (Zero Carbon World) have?
2 charging sockets: 1 × 7 kW Type 2, 1 × 22 kW Type 2.
Who operates Units B&C?
Units B&C is on the Zero Carbon World network. For site issues, the operator lists 01172307172.
Can anyone charge at Units B&C (Zero Carbon World)?
The operator lists this charger for customers of the site.
Where is the nearest charger with 50 kW or more to Units B&C (Zero Carbon World)?
Gateway Information Centre (Be.EV) is 1.4 miles away in a straight line, with up to 150 kW. Check its live status before you set off.
How long does a Tesla Model Y Long Range take to charge at Units B&C (Zero Carbon World)?
A 10–80% charge takes about 5h 2m on the 22 kW Type 2 here, adding roughly 55 kWh. Estimates assume a typical charge curve and a warm battery.
How long does a Tesla Model 3 Rear-Wheel Drive take to charge at Units B&C (Zero Carbon World)?
A 10–80% charge takes about 3h 38m on the 22 kW Type 2 here, adding roughly 40 kWh. Estimates assume a typical charge curve and a warm battery.
How long does an Audi Q4 e-tron 50 take to charge at Units B&C (Zero Carbon World)?
A 10–80% charge takes about 4h 39m on the 22 kW Type 2 here, adding roughly 51 kWh. Estimates assume a typical charge curve and a warm battery.
Chargers near this site
- Broadway Lane
- Gateway Information Centre
- The Gateway Cafe
- Pod Point Tesco Extra - Cirencester
- Shell Recharge EV Aldi Cirencester
- Lidl Stores
- Cheapest nearby
- Pod Point Tesco Extra - Cirencester · 44.4p per kWh · 7 kW · 2.8 mi
- Fastest nearby
- Gateway Information Centre · 150 kW · 1.4 mi