Zero Carbon World · EV charging site
Wookey Farm Camping
Monks Ford, Mendip, BA5 1DT
Wookey Farm Camping is an EV charging site in Mendip, Somerset, run by Zero Carbon World. It has a single 7 kW Type 2 socket, and the price is listed as £1 per hr. No other charging site is listed within a mile, and the nearest site with 50 kW or more is Morrisons Wells (GeniePoint), 2.1 miles away.
Status
No live status
We don't have live status for this charger. Check it when you arrive.
Connectors
Site information
- Operator
- Zero Carbon World
- Opening hours
- Not published
- Access
- Public
- Price
- £1 per hr(from Open Charge Map, 15 May 2019)
- Phone (from Open Charge Map)
- 01749 671 859
- Find it
- Street View of this spot ↗
Always check directly with the charge point operator for the most up-to-date information.
Reviews
No reviews yet. Be the first to rate this charger.
Common questions
How much does it cost to charge at Wookey Farm Camping (Zero Carbon World)?
The listed price is £1 per hr. Prices can change, so check the price at the charger before you start.
How fast is charging at Wookey Farm Camping (Zero Carbon World)?
Up to 7 kW AC via Type 2.
How many charging sockets does Wookey Farm Camping (Zero Carbon World) have?
1 charging socket: 1 × 7 kW Type 2.
Who operates Wookey Farm Camping?
Wookey Farm Camping is on the Zero Carbon World network. For site issues, the operator lists 01749 671 859.
Where is the nearest charger with 50 kW or more to Wookey Farm Camping (Zero Carbon World)?
Morrisons Wells (GeniePoint) is 2.1 miles away in a straight line, with up to 50 kW. Check its live status before you set off.
How long does a Tesla Model Y Long Range take to charge at Wookey Farm Camping (Zero Carbon World)?
A 10–80% charge takes about 7h 54m on the 7 kW Type 2 here, adding roughly 55 kWh. Estimates assume a typical charge curve and a warm battery.
How long does a Tesla Model 3 Rear-Wheel Drive take to charge at Wookey Farm Camping (Zero Carbon World)?
A 10–80% charge takes about 5h 42m on the 7 kW Type 2 here, adding roughly 40 kWh. Estimates assume a typical charge curve and a warm battery.
How long does an Audi Q4 e-tron 50 take to charge at Wookey Farm Camping (Zero Carbon World)?
A 10–80% charge takes about 7h 18m on the 7 kW Type 2 here, adding roughly 51 kWh. Estimates assume a typical charge curve and a warm battery.
Chargers near this site
- Tucker Street Car Park 1
- Pod Point Tesco Superstore - Wells
- Union Street Car Park 1
- Morrisons Wells
- Best Western Plus Swan Hotel
- South Street Car Park, Wells 1
- Cheapest nearby
- Pod Point Tesco Superstore - Wells · 44.4p per kWh · 7 kW · 2 mi
- Fastest nearby
- Morrisons Wells · 50 kW · 2.1 mi