Zero Carbon World · EV charging site
Yew Lodge Hotel
East Midlands Airport, Long Eaton, DE74 2DF
Yew Lodge Hotel is an EV charging site in Long Eaton, Derbyshire, run by Zero Carbon World. Both of its sockets are 7 kW Type 2, and charging is listed as free. No other charging site is listed within a mile, and the nearest site with 50 kW or more is EH - MOTO Donington Park (GRIDSERVE), 1.4 miles away.
Status
No live status
We don't have live status for this charger. Check it when you arrive.
Connectors
Site information
- Operator
- Zero Carbon World
- Opening hours
- Not published
- Access
- Customers only
- Price
- Free(from Open Charge Map, 13 May 2019)
- Find it
- Street View of this spot ↗
Facilities
Always check directly with the charge point operator for the most up-to-date information.
Reviews
No reviews yet. Be the first to rate this charger.
Common questions
How much does it cost to charge at Yew Lodge Hotel (Zero Carbon World)?
The listed price is Free. Prices can change, so check the price at the charger before you start.
How fast is charging at Yew Lodge Hotel (Zero Carbon World)?
Up to 7 kW AC via Type 2.
How many charging sockets does Yew Lodge Hotel (Zero Carbon World) have?
2 charging sockets: 1 × 7 kW Type 2.
Who operates Yew Lodge Hotel?
Yew Lodge Hotel is on the Zero Carbon World network.
Can anyone charge at Yew Lodge Hotel (Zero Carbon World)?
The operator lists this charger for customers of the site.
Where is the nearest charger with 50 kW or more to Yew Lodge Hotel (Zero Carbon World)?
EH - MOTO Donington Park (GRIDSERVE) is 1.4 miles away in a straight line, with up to 360 kW. Check its live status before you set off.
How long does a Tesla Model Y Long Range take to charge at Yew Lodge Hotel (Zero Carbon World)?
A 10–80% charge takes about 7h 54m on the 7 kW Type 2 here, adding roughly 55 kWh. Estimates assume a typical charge curve and a warm battery.
How long does a Tesla Model 3 Rear-Wheel Drive take to charge at Yew Lodge Hotel (Zero Carbon World)?
A 10–80% charge takes about 5h 42m on the 7 kW Type 2 here, adding roughly 40 kWh. Estimates assume a typical charge curve and a warm battery.
How long does an Audi Q4 e-tron 50 take to charge at Yew Lodge Hotel (Zero Carbon World)?
A 10–80% charge takes about 7h 18m on the 7 kW Type 2 here, adding roughly 51 kWh. Estimates assume a typical charge curve and a warm battery.
Chargers near this site
- EH - MOTO Donington Park
- Donnington Park Moto M1 Services / Nomadpower
- Pod Point Clapgun Street Car Park
- Long Eaton Train Station Car-Park
- Station Road
- Langley Priory
- Cheapest nearby
- Pod Point Clapgun Street Car Park · 80.4p per kWh · 7 kW · 2.2 mi
- Fastest nearby
- EH - MOTO Donington Park · 360 kW · 1.4 mi