Amp Map is in beta - data and features are still being developed. Any feedback is appreciated.Amp Map is in beta. Send feedback

Zest Charging · EV charging site

Kennedy Centre (Rear)

564 - 568 Falls Rd, Belfast, BT11 9AE

Kennedy Centre (Rear) is an EV charging site in Belfast, City of Belfast, run by Zest Charging. All 6 of its sockets are 120 kW CCS. 13 other charging sites are listed within a mile, and the nearest other site with 50 kW or more is IONITY GmbH IONITY Belfast, 0.1 miles away.

Status

No live status

We don't have live status for this charger. Check it when you arrive.

Community dataThird-party data from Open Charge Map contributors. It may be out of date or inaccurate - check with the operator before relying on it.Last verified 4 Oct 2025Last verified 4 Oct 2025

Connectors

CCS · 120 kW6 connectors

Site information

Opening hours
Not published
Access
Public · membership required · access key required
Phone (from Open Charge Map)
+44 333 577 6760

Always check directly with the charge point operator for the most up-to-date information.

Charge times by car

Charge window10–80%
Tesla Model Y Long Range 10–80% · 120 kW CCS~31 min
Tesla Model 3 Rear-Wheel Drive 10–80% · 120 kW CCS~26 min
Audi Q4 e-tron 50 10–80% · 120 kW CCS~40 min
Hyundai IONIQ 5 10–80% · 120 kW CCS~27 min
MG Motor MG4 Trophy 10–80% · 120 kW CCS~32 min
Hyundai Kona Electric Long Range 10–80% · 120 kW CCS~39 min

Estimates assume a typical charge curve and a warm battery.

Reviews

No reviews yet. Be the first to rate this charger.

Rate this charger

Common questions

How fast is charging at Kennedy Centre (Rear) (Zest Charging)?

Up to 120 kW DC via CCS.

How many charging sockets does Kennedy Centre (Rear) (Zest Charging) have?

6 charging sockets: 6 × 120 kW CCS.

Who operates Kennedy Centre (Rear)?

Kennedy Centre (Rear) is on the Zest Charging network. For site issues, the operator lists +44 333 577 6760.

Where is the nearest other charger with 50 kW or more to Kennedy Centre (Rear) (Zest Charging)?

IONITY GmbH IONITY Belfast is 0.1 miles away in a straight line, with up to 350 kW. Check its live status before you set off.

How long does a Tesla Model Y Long Range take to charge at Kennedy Centre (Rear) (Zest Charging)?

A typical 10–80% rapid charge takes about 31 min on the 120 kW CCS here, adding roughly 55 kWh. Estimates assume a typical charge curve and a warm battery.

How long does a Tesla Model 3 Rear-Wheel Drive take to charge at Kennedy Centre (Rear) (Zest Charging)?

A typical 10–80% rapid charge takes about 26 min on the 120 kW CCS here, adding roughly 40 kWh. Estimates assume a typical charge curve and a warm battery.

How long does an Audi Q4 e-tron 50 take to charge at Kennedy Centre (Rear) (Zest Charging)?

A typical 10–80% rapid charge takes about 40 min on the 120 kW CCS here, adding roughly 51 kWh. Estimates assume a typical charge curve and a warm battery.

Data: Open Charge Map · verified 4 Oct 2025

Amp Map does not take payment. You pay the operator.