Zest Charging · EV charging site
Kennedy Centre (Rear)
564 - 568 Falls Rd, Belfast, BT11 9AE
Kennedy Centre (Rear) is an EV charging site in Belfast, City of Belfast, run by Zest Charging. All 6 of its sockets are 120 kW CCS. 13 other charging sites are listed within a mile, and the nearest other site with 50 kW or more is IONITY GmbH IONITY Belfast, 0.1 miles away.
Status
No live status
We don't have live status for this charger. Check it when you arrive.
Connectors
Site information
- Operator
- Zest Charging
- Opening hours
- Not published
- Access
- Public · membership required · access key required
- Phone (from Open Charge Map)
- +44 333 577 6760
- Find it
- Street View of this spot ↗
Always check directly with the charge point operator for the most up-to-date information.
Reviews
No reviews yet. Be the first to rate this charger.
Common questions
How fast is charging at Kennedy Centre (Rear) (Zest Charging)?
Up to 120 kW DC via CCS.
How many charging sockets does Kennedy Centre (Rear) (Zest Charging) have?
6 charging sockets: 6 × 120 kW CCS.
Who operates Kennedy Centre (Rear)?
Kennedy Centre (Rear) is on the Zest Charging network. For site issues, the operator lists +44 333 577 6760.
Where is the nearest other charger with 50 kW or more to Kennedy Centre (Rear) (Zest Charging)?
IONITY GmbH IONITY Belfast is 0.1 miles away in a straight line, with up to 350 kW. Check its live status before you set off.
How long does a Tesla Model Y Long Range take to charge at Kennedy Centre (Rear) (Zest Charging)?
A typical 10–80% rapid charge takes about 31 min on the 120 kW CCS here, adding roughly 55 kWh. Estimates assume a typical charge curve and a warm battery.
How long does a Tesla Model 3 Rear-Wheel Drive take to charge at Kennedy Centre (Rear) (Zest Charging)?
A typical 10–80% rapid charge takes about 26 min on the 120 kW CCS here, adding roughly 40 kWh. Estimates assume a typical charge curve and a warm battery.
How long does an Audi Q4 e-tron 50 take to charge at Kennedy Centre (Rear) (Zest Charging)?
A typical 10–80% rapid charge takes about 40 min on the 120 kW CCS here, adding roughly 51 kWh. Estimates assume a typical charge curve and a warm battery.
Chargers near this site
- Sainsbury's Car Park
- IONITY GmbH IONITY Belfast
- Lidl
- Bavarian BMW, 2 Boucher Crescent
- Whiterock Leisure Centre
- Charles Hurst Renault
- Cheapest nearby
- IONITY GmbH IONITY Belfast · 83.3p per kWh · 350 kW · 0.1 mi
- Fastest nearby
- IONITY GmbH IONITY Belfast · 350 kW · 0.1 mi