# Merry Hill Car Park P6 · Zest Charging

Web page: https://ampmap.co.uk/charger/zest-charging-merry-hill-car-park-p6-uk

Merry Hill Car Park P6 is an EV charging site in Brierley Hill, Dudley, run by Zest Charging. All 10 of its sockets are 22 kW Type 2, and the price is listed as £0.43/kWh.

## Status

We don't have live status for this charger. Check it when you arrive.

## Location

- **Address:** Central Way, DY5 1SZ
- **Area:** Brierley Hill, Dudley, United Kingdom
- **Coordinates (latitude, longitude):** 52.48043, -2.11302

## Connectors and prices

| Connector | Power | Sockets | Price per kWh |
| --- | --- | --- | --- |
| Type 2 | 22 kW | 12 | Not listed |

- **Price:** £0.43/kWh (from Open Charge Map)

## Site information

- **Operator:** Zest Charging
- **Opening hours:** Not published
- **Access:** Public · membership required · access key required
- **Notes:** Bespoke app required

## Common questions

### How much does it cost to charge at Merry Hill Car Park P6 (Zest Charging)?

The listed price is £0.43/kWh. Prices can change, so check the price at the charger before you start.

### How fast is charging at Merry Hill Car Park P6 (Zest Charging)?

Up to 22 kW AC via Type 2.

### How many charging sockets does Merry Hill Car Park P6 (Zest Charging) have?

10 charging sockets: 1 × 22 kW Type 2, 1 × 22 kW Type 2, 1 × 22 kW Type 2, 1 × 22 kW Type 2, 1 × 22 kW Type 2, 1 × 22 kW Type 2, 1 × 22 kW Type 2, 1 × 22 kW Type 2, 1 × 22 kW Type 2, 1 × 22 kW Type 2, 1 × 22 kW Type 2, 1 × 22 kW Type 2.

### Who operates Merry Hill Car Park P6?

Merry Hill Car Park P6 is on the Zest Charging network. For site issues, the operator lists +44 333 577 6760.

### How long does a Tesla Model Y Long Range take to charge at Merry Hill Car Park P6 (Zest Charging)?

A 10–80% charge takes about 5h 2m on the 22 kW Type 2 here, adding roughly 55 kWh. Estimates assume a typical charge curve and a warm battery.

### How long does a Tesla Model 3 Rear-Wheel Drive take to charge at Merry Hill Car Park P6 (Zest Charging)?

A 10–80% charge takes about 3h 38m on the 22 kW Type 2 here, adding roughly 40 kWh. Estimates assume a typical charge curve and a warm battery.

### How long does an Audi Q4 e-tron 50 take to charge at Merry Hill Car Park P6 (Zest Charging)?

A 10–80% charge takes about 4h 39m on the 22 kW Type 2 here, adding roughly 51 kWh. Estimates assume a typical charge curve and a warm battery.

## Explore the area

- [More chargers in Brierley Hill](https://ampmap.co.uk/chargers/united-kingdom/dudley/brierley-hill)
- [Zest Charging chargers](https://ampmap.co.uk/networks/zest-charging)

## Chargers near this site

- [zest-gold-type-plan · Zest Charging](https://ampmap.co.uk/charger/zest-charging-zest-gold-type-plan-uk) - Type 2 75 kW · The Embankment
- [Merry Hill, UK · Tesla](https://ampmap.co.uk/charger/tesla-merry-hill-supercharger-uk) - CCS 250 kW · Pedmore Road · From 25p/kWh
- [zest-pair-city-tour · Zest Charging](https://ampmap.co.uk/charger/zest-charging-zest-pair-city-tour-uk) - Type 2 75 kW · Brierley Hill
- [zest-case-food-need · Zest Charging](https://ampmap.co.uk/charger/zest-charging-zest-case-food-need-uk) - Type 2 7 kW · Pedmore road
- [zest-step-year-bill · Zest Charging](https://ampmap.co.uk/charger/zest-charging-zest-step-year-bill-uk) - Type 2 22 kW · Central Way
- [Level Street, Brierly Hill - Public Car Park · Charge Your Car](https://ampmap.co.uk/charger/charge-your-car-level-street-brierly-hill-public-car-park-uk) - CCS 50 kW, CHAdeMO 50 kW · Brierly Hill

## Links

- [This charger as JSON, with live socket status](https://ampmap.co.uk/api/chargers/zest-charging-merry-hill-car-park-p6-uk)
- [Use Amp Map in an AI assistant](https://ampmap.co.uk/assistants)

---

Data: Open Charge Map (verified 10 Jan 2023).

Third-party data from Open Charge Map contributors. It may be out of date or inaccurate - check with the operator before relying on it.

Always check directly with the charge point operator for the most up-to-date information.
