Zest Charging · EV charging site
Metrocentre Green Car Park
St Michael's Way, Whickham, NE11 9YG
Metrocentre Green Car Park is an EV charging site in Whickham, Gateshead (NE11 9YG), run by Zest Charging. All 4 of its sockets are 60 kW CCS. Amp Map lists 1 other charge point named Metrocentre Green Car Park in Whickham. 13 other charging sites are listed within a mile, and the nearest other site with 50 kW or more is IONITY GmbH IONITY Newcastle Metrocentre, 0.4 miles away.
Status
No live status
We don't have live status for this charger. Check it when you arrive.
Connectors
Site information
- Operator
- Zest Charging
- Opening hours
- Not published
- Access
- Public
- Phone (from Open Charge Map)
- +44 333 577 6760
- Find it
- Street View of this spot ↗
Facilities
Always check directly with the charge point operator for the most up-to-date information.
Reviews
No reviews yet. Be the first to rate this charger.
Common questions
How fast is charging at Metrocentre Green Car Park (Zest Charging)?
Up to 60 kW DC via CCS.
How many charging sockets does Metrocentre Green Car Park (Zest Charging) have?
4 charging sockets: 1 × 60 kW CCS, 1 × 60 kW CCS.
Who operates Metrocentre Green Car Park?
Metrocentre Green Car Park is on the Zest Charging network. For site issues, the operator lists +44 333 577 6760.
Where is the nearest other charger with 50 kW or more to Metrocentre Green Car Park (Zest Charging)?
IONITY GmbH IONITY Newcastle Metrocentre is 0.4 miles away in a straight line, with up to 350 kW. Check its live status before you set off.
How long does a Tesla Model Y Long Range take to charge at Metrocentre Green Car Park (Zest Charging)?
A typical 10–80% rapid charge takes about 58 min on the 60 kW CCS here, adding roughly 55 kWh. Estimates assume a typical charge curve and a warm battery.
How long does a Tesla Model 3 Rear-Wheel Drive take to charge at Metrocentre Green Car Park (Zest Charging)?
A typical 10–80% rapid charge takes about 43 min on the 60 kW CCS here, adding roughly 40 kWh. Estimates assume a typical charge curve and a warm battery.
How long does an Audi Q4 e-tron 50 take to charge at Metrocentre Green Car Park (Zest Charging)?
A typical 10–80% rapid charge takes about 57 min on the 60 kW CCS here, adding roughly 51 kWh. Estimates assume a typical charge curve and a warm battery.
Chargers near this site
- Metrocentre Green Car Park
- Metro Centre Green Car Park
- Metrocentre Red Car Park
- Metrocentre Yellow Car Park
- Metro Yellow Car Park
- IONITY GmbH IONITY Newcastle Metrocentre
- Cheapest nearby
- IONITY GmbH IONITY Newcastle Metrocentre · 83.3p per kWh · 350 kW · 0.4 mi
- Fastest nearby
- IONITY GmbH IONITY Newcastle Metrocentre · 350 kW · 0.4 mi