Zest Charging · EV charging site
Morant House Zest EV
Stockwell Road, Brixton, SW9 9EU
Morant House Zest EV is an EV charging site in Brixton, Greater London, run by Zest Charging. Both of its sockets are 100 kW CCS, and the price is listed as £0.75 per kWh (Dec 2024). 47 other charging sites are listed within a mile, and the nearest other site with 50 kW or more is [E-TAXI ONLY] Morant House (BP Pulse), 20 yards away.
Status
No live status
We don't have live status for this charger. Check it when you arrive.
Connectors
Site information
- Operator
- Zest Charging
- Opening hours
- Not published
- Access
- Public
- Price
- £0.75 per kWh (Dec 2024)(from Open Charge Map, 15 Dec 2024)
- Phone (from Open Charge Map)
- +44 333 577 6760
- Getting there
- Max stay 1 hour.
- Find it
- Street View of this spot ↗
Always check directly with the charge point operator for the most up-to-date information.
Reviews
No reviews yet. Be the first to rate this charger.
Common questions
How much does it cost to charge at Morant House Zest EV (Zest Charging)?
The listed price is £0.75 per kWh (Dec 2024). Prices can change, so check the price at the charger before you start.
How fast is charging at Morant House Zest EV (Zest Charging)?
Up to 100 kW DC via CCS.
How many charging sockets does Morant House Zest EV (Zest Charging) have?
2 charging sockets: 1 × 100 kW CCS, 1 × 100 kW CCS.
Who operates Morant House Zest EV?
Morant House Zest EV is on the Zest Charging network. For site issues, the operator lists +44 333 577 6760.
Where is the nearest other charger with 50 kW or more to Morant House Zest EV (Zest Charging)?
[E-TAXI ONLY] Morant House (BP Pulse) is 20 yards away in a straight line, with up to 50 kW. Check its live status before you set off.
How long does a Tesla Model Y Long Range take to charge at Morant House Zest EV (Zest Charging)?
A typical 10–80% rapid charge takes about 36 min on the 100 kW CCS here, adding roughly 55 kWh. Estimates assume a typical charge curve and a warm battery.
How long does a Tesla Model 3 Rear-Wheel Drive take to charge at Morant House Zest EV (Zest Charging)?
A typical 10–80% rapid charge takes about 29 min on the 100 kW CCS here, adding roughly 40 kWh. Estimates assume a typical charge curve and a warm battery.
How long does an Audi Q4 e-tron 50 take to charge at Morant House Zest EV (Zest Charging)?
A typical 10–80% rapid charge takes about 43 min on the 100 kW CCS here, adding roughly 51 kWh. Estimates assume a typical charge curve and a warm battery.
Chargers near this site
- [E-TAXI ONLY] Morant House
- ubitricity Distributed Energy Systems UK Ltd. 13A Union Road, opp.
- Chelsham Road, Lambeth
- 195 South Lambeth Road
- Lambeth/Clenergy Stockwell Avenue
- Lambeth Springfield Estate 1
- Cheapest nearby
- ubitricity Distributed Energy Systems UK Ltd. 13A Union Road, opp. · 56p per kWh · 5 kW · 0.3 mi