Zest Charging · EV charging site
zest-date-owed-dust
Rising Sun, Saltash, PL17 8JB
zest-date-owed-dust is an EV charging site in Saltash, Cornwall, run by Zest Charging. It has a single 22 kW Type 2 socket. No other charging site is listed within a mile, and the nearest site with 50 kW or more is New Road, Callington (POGO), 2.4 miles away.
Status
No live status
We don't have live status for this charger. Check it when you arrive.
Connectors
Site information
- Operator
- Zest Charging
- Opening hours
- Not published
- Access
- Public
- Phone (from Open Charge Map)
- +44 333 577 6760
- Find it
- Street View of this spot ↗
Always check directly with the charge point operator for the most up-to-date information.
Reviews
No reviews yet. Be the first to rate this charger.
Common questions
How fast is charging at zest-date-owed-dust (Zest Charging)?
Up to 22 kW AC via Type 2.
How many charging sockets does zest-date-owed-dust (Zest Charging) have?
1 charging socket: 1 × 22 kW Type 2.
Who operates zest-date-owed-dust?
zest-date-owed-dust is on the Zest Charging network. For site issues, the operator lists +44 333 577 6760.
Where is the nearest charger with 50 kW or more to zest-date-owed-dust (Zest Charging)?
New Road, Callington (POGO) is 2.4 miles away in a straight line, with up to 50 kW. Check its live status before you set off.
How long does a Tesla Model Y Long Range take to charge at zest-date-owed-dust (Zest Charging)?
A 10–80% charge takes about 5h 2m on the 22 kW Type 2 here, adding roughly 55 kWh. Estimates assume a typical charge curve and a warm battery.
How long does a Tesla Model 3 Rear-Wheel Drive take to charge at zest-date-owed-dust (Zest Charging)?
A 10–80% charge takes about 3h 38m on the 22 kW Type 2 here, adding roughly 40 kWh. Estimates assume a typical charge curve and a warm battery.
How long does an Audi Q4 e-tron 50 take to charge at zest-date-owed-dust (Zest Charging)?
A 10–80% charge takes about 4h 39m on the 22 kW Type 2 here, adding roughly 51 kWh. Estimates assume a typical charge curve and a warm battery.
Chargers near this site
- Cheapest nearby
- Pod Point Tesco Superstore - Callington · 44.4p per kWh · 7 kW · 2 mi
- Fastest nearby
- New Road, Callington · 50 kW · 2.4 mi