Zest Charging · EV charging site
zest-park-race-year
Chandus Court, Bristol, BS2 0UH
zest-park-race-year is an EV charging site in Bristol, City of Bristol, run by Zest Charging. It has a single 120 kW Type 2 socket. 17 other charging sites are listed within a mile, and the nearest other site with 50 kW or more is DTM Ltd (Bosch service place) (BP Pulse), 0.1 miles away.
Status
No live status
We don't have live status for this charger. Check it when you arrive.
Connectors
Site information
- Operator
- Zest Charging
- Opening hours
- Not published
- Access
- Public
- Phone (from Open Charge Map)
- +44 333 577 6760
- Find it
- Street View of this spot ↗
Always check directly with the charge point operator for the most up-to-date information.
Reviews
No reviews yet. Be the first to rate this charger.
Common questions
How fast is charging at zest-park-race-year (Zest Charging)?
Up to 120 kW DC via Type 2.
How many charging sockets does zest-park-race-year (Zest Charging) have?
1 charging socket: 1 × 120 kW Type 2.
Who operates zest-park-race-year?
zest-park-race-year is on the Zest Charging network. For site issues, the operator lists +44 333 577 6760.
Where is the nearest other charger with 50 kW or more to zest-park-race-year (Zest Charging)?
DTM Ltd (Bosch service place) (BP Pulse) is 0.1 miles away in a straight line, with up to 50 kW. Check its live status before you set off.
How long does a Tesla Model Y Long Range take to charge at zest-park-race-year (Zest Charging)?
A typical 10–80% rapid charge takes about 31 min on the 120 kW Type 2 here, adding roughly 55 kWh. Estimates assume a typical charge curve and a warm battery.
How long does a Tesla Model 3 Rear-Wheel Drive take to charge at zest-park-race-year (Zest Charging)?
A typical 10–80% rapid charge takes about 26 min on the 120 kW Type 2 here, adding roughly 40 kWh. Estimates assume a typical charge curve and a warm battery.
How long does an Audi Q4 e-tron 50 take to charge at zest-park-race-year (Zest Charging)?
A typical 10–80% rapid charge takes about 40 min on the 120 kW Type 2 here, adding roughly 51 kWh. Estimates assume a typical charge curve and a warm battery.
Chargers near this site
- DTM Ltd (Bosch service place)
- MFG York Road
- Temple Gate Car Park 1
- Templegate Car Park
- Shell Recharge Shell Arnos Castle
- Private Car Park
- Cheapest nearby
- Shell Recharge Shell Arnos Castle · 85p per kWh · 300 kW · 0.6 mi
- Fastest nearby
- Shell Recharge Shell Arnos Castle · 300 kW · 0.6 mi