Vehicle
2025 XPeng X9 AWD
Charge times & specs
Specs
- Usable battery
- 101.5 kWh
- Battery chemistry
- NMC
- Peak DC rate
- 300 kW
- Peak AC rate
- 11 kW
- Charging architecture
- 800 V
- Rated range (CLTC)
- 436 miles
- Efficiency (from rated range)
- 4.3 miles/kWh
- Charge-port location
- Rear right
- Heat pump
- Yes
- Drivetrain
- All-wheel drive
- Power
- 370 kW
- 0–62 mph
- 5.7 s
- Kerb weight
- 2,750 kg
- Connectors
- GB/T
Rated range is the figure published for the test cycle named beside it. Real-world range is usually lower, and figures from different test cycles do not compare.
How long does the 2025 XPeng X9 AWD take to charge?
Estimate| Charger | Time |
|---|---|
| AC 7.4 kW · 0–100% at 7.4 kW | 13 h 43 min |
| AC 22 kW · 0–100% at 11 kW | 9 h 14 min |
| Rapid 50 kW · 10–80% at up to 50 kW | ~90 min |
| Ultra-rapid 150 kW · 10–80% at up to 150 kW | ~30 min |
| Ultra-rapid 350 kW · 10–80% at up to 300 kW | ~19 min |
| Manufacturer figure · 10–80% at 300 kW | 10 min |
Estimates assume a typical charge curve and a warm battery - cold weather, a nearly-full battery, or a busy shared unit can slow things down.
What does it cost to charge?
In pence per kWh: your home tariff or a charger's listed price.
Costs follow your rate and the car's usable battery. Cost per mile uses the rated range, so real-world cost per mile is usually higher.
Specs: XPeng X9 AWD 2025 Specifications · via OpenEV Data
Other model years: 2024