Amp Map is in beta - data and features are still being developed. Any feedback is appreciated.Amp Map is in beta. Send feedback

EV charging site

1085 High Road

1085 High Road, Friern Barnet, N12 0EY

1085 High Road is an EV charging site in Friern Barnet, Greater London. Its 2 sockets reach up to 25 kW, with Type 2 at the top speed. 19 other charging sites are listed within a mile, and the nearest site with 50 kW or more is MFG Whetstone (MFG EV Power), 0.2 miles away.

Status

No live status

We don't have live status for this charger. Check it when you arrive.

Community dataThird-party data from Open Charge Map contributors. It may be out of date or inaccurate - check with the operator before relying on it.Last verified 7 Dec 2023Last verified 7 Dec 2023

Connectors

Type 2 · 25 kW1 connector
CHAdeMO · 22 kW1 connector

Site information

Opening hours
Not published
Access
Public
Payment
Pay at the charger (from Open Charge Map)

Always check directly with the charge point operator for the most up-to-date information.

Charge times by car

Charge window10–80%
Tesla Model Y Long Range 10–80% · 25 kW Type 2~2h 20m
Tesla Model 3 Rear-Wheel Drive 10–80% · 25 kW Type 2~1h 41m
Audi Q4 e-tron 50 10–80% · 25 kW Type 2~2h 9m
Hyundai IONIQ 5 10–80% · 25 kW Type 2~2h 8m
MG Motor MG4 Trophy 10–80% · 25 kW Type 2~1h 48m
Hyundai Kona Electric Long Range 10–80% · 25 kW Type 2~1h 43m
Nissan LEAF 10–80% · 25 kW Type 2~76 min

Estimates assume a typical charge curve and a warm battery.

Reviews

No reviews yet. Be the first to rate this charger.

Rate this charger

Common questions

How fast is charging at 1085 High Road?

Up to 25 kW DC via CHAdeMO, Type 2.

How many charging sockets does 1085 High Road have?

2 charging sockets: 1 × 22 kW CHAdeMO, 1 × 25 kW Type 2.

Where is the nearest charger with 50 kW or more to 1085 High Road?

MFG Whetstone (MFG EV Power) is 0.2 miles away in a straight line, with up to 150 kW. Check its live status before you set off.

How long does a Tesla Model Y Long Range take to charge at 1085 High Road?

A typical 10–80% rapid charge takes about 2h 20m on the 25 kW Type 2 here, adding roughly 55 kWh. Estimates assume a typical charge curve and a warm battery.

How long does a Tesla Model 3 Rear-Wheel Drive take to charge at 1085 High Road?

A typical 10–80% rapid charge takes about 1h 41m on the 25 kW Type 2 here, adding roughly 40 kWh. Estimates assume a typical charge curve and a warm battery.

How long does an Audi Q4 e-tron 50 take to charge at 1085 High Road?

A typical 10–80% rapid charge takes about 2h 9m on the 25 kW Type 2 here, adding roughly 51 kWh. Estimates assume a typical charge curve and a warm battery.

Data: Open Charge Map · verified 7 Dec 2023

Amp Map does not take payment. You pay the operator.