MFG EV Power · EV charging site
MFG Whetstone
1182-1202 High Road, Totteridge, N20 0LH
MFG Whetstone is an EV charging site in Totteridge, Greater London, run by MFG EV Power. It has a single socket, with CCS at up to 150 kW, and the price is listed as £0.79/kWh. 19 other charging sites are listed within a mile, and the nearest other site with 50 kW or more is Shell Recharge EV Waitrose - Whetstone, 0.2 miles away.
Status
No live status
We don't have live status for this charger. Check it when you arrive.
Connectors
Site information
- Operator
- MFG EV Power
- Opening hours
- Not published
- Access
- Public
- Payment
- Pay at the charger (from Open Charge Map)
- Price
- £0.79/kWh(from Open Charge Map, 3 Apr 2023)
- Phone (from Open Charge Map)
- +44 20 8515 8559
- Find it
- Street View of this spot ↗
Always check directly with the charge point operator for the most up-to-date information.
Reviews
No reviews yet. Be the first to rate this charger.
Common questions
How much does it cost to charge at MFG Whetstone (MFG EV Power)?
The listed price is £0.79/kWh. Prices can change, so check the price at the charger before you start.
How fast is charging at MFG Whetstone (MFG EV Power)?
Up to 150 kW DC via CCS, CHAdeMO.
How many charging sockets does MFG Whetstone (MFG EV Power) have?
1 charging socket: 2 × 150 kW CCS, 1 × 50 kW CHAdeMO.
Who operates MFG Whetstone?
MFG Whetstone is on the MFG EV Power network. For site issues, the operator lists +44 20 8515 8559.
Where is the nearest other charger with 50 kW or more to MFG Whetstone (MFG EV Power)?
Shell Recharge EV Waitrose - Whetstone is 0.2 miles away in a straight line, with up to 120 kW. Check its live status before you set off.
How long does a Tesla Model Y Long Range take to charge at MFG Whetstone (MFG EV Power)?
A typical 10–80% rapid charge takes about 27 min on the 150 kW CCS here, adding roughly 55 kWh. Estimates assume a typical charge curve and a warm battery.
How long does a Tesla Model 3 Rear-Wheel Drive take to charge at MFG Whetstone (MFG EV Power)?
A typical 10–80% rapid charge takes about 24 min on the 150 kW CCS here, adding roughly 40 kWh. Estimates assume a typical charge curve and a warm battery.
How long does an Audi Q4 e-tron 50 take to charge at MFG Whetstone (MFG EV Power)?
A typical 10–80% rapid charge takes about 39 min on the 150 kW CCS here, adding roughly 51 kWh. Estimates assume a typical charge curve and a warm battery.
Chargers near this site
- Barnet House e-Car
- Shell Recharge EV Waitrose - Whetstone
- 1085 High Road
- ubitricity Distributed Energy Systems UK Ltd. 59 Swan Lane, 07
- Totteridge and Whetstone Underground Station - Taxi charger
- ubitricity Distributed Energy Systems UK Ltd. 50 Pollard Road
- Cheapest nearby
- ubitricity Distributed Energy Systems UK Ltd. 59 Swan Lane, 07 · 57p per kWh · 5 kW · 0.2 mi