Amp Map is in beta - data and features are still being developed. Any feedback is appreciated.Amp Map is in beta. Send feedback

AFS · EV charging site

AFS

Utilita Energy, Eastleigh, SO53 3QB

AFS is an EV charging site in Eastleigh, Hampshire, run by AFS and open 24 hours a day. All 8 of its sockets are 22 kW Type 2. Recorded live status shows it is usually busiest around 9 am, and Amp Map measured 99% uptime and recorded 99 charging sessions here over the last 30 days. 2 other charging sites are listed within a mile, and the nearest site with 50 kW or more is IONITY GmbH IONITY Southampton VH, 0.1 miles away.

Status

8 of 8 available

Checking status…

VerifiedLive status and details from AFS’s data feed. Amp Map updates them automatically.Last synced 21 Nov 2026

Connectors

Type 2 · 22 kW8 connectors8 free
Charge Bay 1100% reliabilityAvailable
Charge Bay 296% reliabilityAvailable
Charge Bay 3100% reliabilityAvailable
Charge Bay 498% reliabilityAvailable
Charge Bay 597% reliabilityAvailable
Charge Bay 6100% reliabilityAvailable
Charge Bay 7100% reliabilityAvailable
Charge Bay 8100% reliabilityAvailable

Reliability is the share of time each socket was not out of order, over the last 30 days.

Site information

Operator
AFS
Opening hours
Open 24 hours
Payment
Bank card at the chargerIn the operator's appRFID card
Charger ID
Charge Bay 1

Always check directly with the charge point operator for the most up-to-date information.

Charge times by car

Charge window10–80%
Tesla Model Y Long Range 10–80% · 22 kW Type 2~5h 2m
Tesla Model 3 Rear-Wheel Drive 10–80% · 22 kW Type 2~3h 38m
Audi Q4 e-tron 50 10–80% · 22 kW Type 2~4h 39m
Hyundai IONIQ 5 10–80% · 22 kW Type 2~4h 37m
MG Motor MG4 Trophy 10–80% · 22 kW Type 2~3h 53m
Hyundai Kona Electric Long Range 10–80% · 22 kW Type 2~5h 38m
Nissan LEAF 10–80% · 22 kW Type 2~4h 15m

Estimates assume a typical charge curve and a warm battery.

Reviews

No reviews yet. Be the first to rate this charger.

Rate this charger

Common questions

How fast is charging at AFS?

Up to 22 kW AC via Type 2.

How many charging sockets does AFS have?

8 charging sockets: 8 × 22 kW Type 2. Live per-socket availability is shown on this page.

Is AFS open 24/7?

Yes - AFS is open 24 hours a day, 7 days a week.

When is AFS busiest?

Measured from recorded socket occupancy across the week, it is typically busiest around 9 am and quietest around 9 pm. The live status on this page shows what is free before you set off.

How reliable is AFS?

Amp Map measured 99% uptime here from recorded live status over the last 30 days, across 99 observed charging sessions.

Who operates AFS?

AFS is on the AFS network.

Where is the nearest charger with 50 kW or more to AFS?

IONITY GmbH IONITY Southampton VH is 0.1 miles away in a straight line, with up to 400 kW. Check its live status before you set off.

How long does a Tesla Model Y Long Range take to charge at AFS?

A 10–80% charge takes about 5h 2m on the 22 kW Type 2 here, adding roughly 55 kWh. Estimates assume a typical charge curve and a warm battery.

How long does a Tesla Model 3 Rear-Wheel Drive take to charge at AFS?

A 10–80% charge takes about 3h 38m on the 22 kW Type 2 here, adding roughly 40 kWh. Estimates assume a typical charge curve and a warm battery.

How long does an Audi Q4 e-tron 50 take to charge at AFS?

A 10–80% charge takes about 4h 39m on the 22 kW Type 2 here, adding roughly 51 kWh. Estimates assume a typical charge curve and a warm battery.

Data: AFS · synced 21 Nov 2026

Amp Map does not take payment. You pay the operator.