Amp Map is in beta - data and features are still being developed. Any feedback is appreciated.Amp Map is in beta. Send feedback

Be.EV · EV charging site

Chestnut Avenue Retail Park

Chestnut Avenue Retail Park, Eastleigh, SO53 3LE

Chestnut Avenue Retail Park is an EV charging site in Eastleigh, Hampshire, run by Be.EV and open 24 hours a day. Its 8 sockets reach up to 150 kW, with CCS at the top speed, and published prices run from £0.59 to £0.89 per kWh. Recorded live status shows it is usually busiest around 10 am, and Amp Map measured 100% uptime and recorded 1014 charging sessions here over the last 30 days. 5 other charging sites are listed within a mile, and the nearest other site with 50 kW or more is IONITY GmbH IONITY Southampton VH, 0.2 miles away.

Status

8 of 8 available

Checking status…

VerifiedLive status and details from Be.EV’s data feed. Amp Map updates them automatically.Last synced 22 Nov 2026

Connectors

CCS · 150 kW4 connectors · 89p per kWh4 free
KM0030-01100% reliabilityAvailable
KM0030-02100% reliabilityAvailable
KM0030-03100% reliabilityAvailable
KM0030-04100% reliabilityAvailable
CCS · 40 kW2 connectors · 84p per kWh2 free
RTM0009-1100% reliabilityAvailable
RTM0009-2100% reliabilityAvailable
Type 2 · 22 kW2 connectors · 59p per kWh2 free
AD00204-1100% reliabilityAvailable
AD00204-2100% reliabilityAvailable

Reliability is the share of time each socket was not out of order, over the last 30 days.

Site information

Operator
Be.EV
Opening hours
Open 24 hours
Parking
Car park
Payment
In the Be.EV app
Charger ID
AD00204-1

Always check directly with the charge point operator for the most up-to-date information.

Prices

ConnectorPowerPrice
CCS150 kW89p per kWh
CCS40 kW84p per kWh
Type 222 kW59p per kWh

Price at the charger, including VAT. Paying in the operator's app may cost less.

Charge times by car

Charge window10–80%
Tesla Model Y Long Range 10–80% · 150 kW CCS~27 min · ≈ 55 kWh · ~£49
Tesla Model 3 Rear-Wheel Drive 10–80% · 150 kW CCS~24 min · ≈ 40 kWh · ~£36
Audi Q4 e-tron 50 10–80% · 150 kW CCS~39 min · ≈ 51 kWh · ~£45
Hyundai IONIQ 5 10–80% · 150 kW CCS~23 min · ≈ 51 kWh · ~£45
MG Motor MG4 Trophy 10–80% · 150 kW CCS~30 min · ≈ 43 kWh · ~£38
Hyundai Kona Electric Long Range 10–80% · 150 kW CCS~39 min · ≈ 41 kWh · ~£36
Nissan LEAF 10–80% · 22 kW Type 2~4h 15m · ≈ 28 kWh · ~£17

Estimates assume a typical charge curve and a warm battery.

Reviews

No reviews yet. Be the first to rate this charger.

Rate this charger

Common questions

How much does it cost to charge at Chestnut Avenue Retail Park (Be.EV)?

The listed price is CCS £0.84/kWh · CCS £0.89/kWh · Type 2 £0.59/kWh. Prices can change, so check the price at the charger before you start.

How fast is charging at Chestnut Avenue Retail Park (Be.EV)?

Up to 150 kW DC via CCS, Type 2.

How many charging sockets does Chestnut Avenue Retail Park (Be.EV) have?

8 charging sockets: 2 × 40 kW CCS, 4 × 150 kW CCS, 2 × 22 kW Type 2. Live per-socket availability is shown on this page.

Is Chestnut Avenue Retail Park (Be.EV) open 24/7?

Yes - Chestnut Avenue Retail Park (Be.EV) is open 24 hours a day, 7 days a week.

When is Chestnut Avenue Retail Park (Be.EV) busiest?

Measured from recorded socket occupancy across the week, it is typically busiest around 10 am and quietest around 11 pm. The live status on this page shows what is free before you set off.

How reliable is Chestnut Avenue Retail Park (Be.EV)?

Amp Map measured 100% uptime here from recorded live status over the last 30 days, across 1014 observed charging sessions.

Who operates Chestnut Avenue Retail Park?

Chestnut Avenue Retail Park is on the Be.EV network.

Where is the nearest other charger with 50 kW or more to Chestnut Avenue Retail Park (Be.EV)?

IONITY GmbH IONITY Southampton VH is 0.2 miles away in a straight line, with up to 400 kW. Check its live status before you set off.

How long does a Tesla Model Y Long Range take to charge at Chestnut Avenue Retail Park (Be.EV)?

A typical 10–80% rapid charge takes about 27 min on the 150 kW CCS here, adding roughly 55 kWh (~£49 at the published price). Estimates assume a typical charge curve and a warm battery.

How long does a Tesla Model 3 Rear-Wheel Drive take to charge at Chestnut Avenue Retail Park (Be.EV)?

A typical 10–80% rapid charge takes about 24 min on the 150 kW CCS here, adding roughly 40 kWh (~£36 at the published price). Estimates assume a typical charge curve and a warm battery.

How long does an Audi Q4 e-tron 50 take to charge at Chestnut Avenue Retail Park (Be.EV)?

A typical 10–80% rapid charge takes about 39 min on the 150 kW CCS here, adding roughly 51 kWh (~£45 at the published price). Estimates assume a typical charge curve and a warm battery.

Data: Be.EV · synced 22 Nov 2026

Amp Map does not take payment. You pay the operator.