Alfapower · EV charging site
Bristol Street
Sheepscar Junction, Leeds, LS7 1DH
Bristol Street is an EV charging site in Leeds, City and Borough of Leeds, run by Alfapower. It has a single socket, with CCS at up to 100 kW, and the price is listed as £0.25/kWh. 12 other charging sites are listed within a mile, and the nearest other site with 50 kW or more is Merrion Centre Car Park, 0.5 miles away.
Status
No live status
We don't have live status for this charger. Check it when you arrive.
Connectors
Site information
- Operator
- Alfapower
- Opening hours
- Not published
- Access
- Public · membership required · access key required
- Price
- £0.25/kWh(from Open Charge Map, 27 Feb 2019)
- Notes
- Alfa Power charger. Activated using App/RFID or QR code.
- Find it
- Street View of this spot ↗
Always check directly with the charge point operator for the most up-to-date information.
Reviews
No reviews yet. Be the first to rate this charger.
Common questions
How much does it cost to charge at Bristol Street (Alfapower)?
The listed price is £0.25/kWh. Prices can change, so check the price at the charger before you start.
How fast is charging at Bristol Street (Alfapower)?
Up to 100 kW DC via CCS, CHAdeMO, Type 2.
How many charging sockets does Bristol Street (Alfapower) have?
1 charging socket: 1 × 100 kW CCS, 1 × 60 kW CHAdeMO, 1 × 43 kW Type 2, 1 × 22 kW Type 2.
Who operates Bristol Street?
Bristol Street is on the Alfapower network.
Where is the nearest other charger with 50 kW or more to Bristol Street (Alfapower)?
Merrion Centre Car Park is 0.5 miles away in a straight line, with up to 50 kW. Check its live status before you set off.
How long does a Tesla Model Y Long Range take to charge at Bristol Street (Alfapower)?
A typical 10–80% rapid charge takes about 36 min on the 100 kW CCS here, adding roughly 55 kWh. Estimates assume a typical charge curve and a warm battery.
How long does a Tesla Model 3 Rear-Wheel Drive take to charge at Bristol Street (Alfapower)?
A typical 10–80% rapid charge takes about 29 min on the 100 kW CCS here, adding roughly 40 kWh. Estimates assume a typical charge curve and a warm battery.
How long does an Audi Q4 e-tron 50 take to charge at Bristol Street (Alfapower)?
A typical 10–80% rapid charge takes about 43 min on the 100 kW CCS here, adding roughly 51 kWh. Estimates assume a typical charge curve and a warm battery.