EV charging site
Merrion Centre Car Park
Merrion Way, Leeds, LS2 8BT
Merrion Centre Car Park is an EV charging site in Leeds, City and Borough of Leeds. Its 2 sockets reach up to 50 kW, with CCS and CHAdeMO at the top speed, and the price is listed as 35p/kWh. 23 other charging sites are listed within a mile, and the nearest other site with 50 kW or more is Bristol Street (Alfapower), 0.5 miles away.
Status
No live status
We don't have live status for this charger. Check it when you arrive.
Connectors
Site information
- Opening hours
- Not published
- Access
- Public
- Payment
- Pay at the charger (from Open Charge Map)
- Price
- 35p/kWh(from Open Charge Map, 1 May 2019)
- Notes
- CitiCharge evolt charger
- Find it
- Street View of this spot ↗
Facilities
Always check directly with the charge point operator for the most up-to-date information.
Reviews
No reviews yet. Be the first to rate this charger.
Common questions
How much does it cost to charge at Merrion Centre Car Park?
The listed price is 35p/kWh. Prices can change, so check the price at the charger before you start.
How fast is charging at Merrion Centre Car Park?
Up to 50 kW DC via CCS, CHAdeMO, Type 2.
How many charging sockets does Merrion Centre Car Park have?
2 charging sockets: 1 × 50 kW CCS, 1 × 50 kW CHAdeMO, 1 × 43 kW Type 2.
Where is the nearest other charger with 50 kW or more to Merrion Centre Car Park?
Bristol Street (Alfapower) is 0.5 miles away in a straight line, with up to 100 kW. Check its live status before you set off.
How long does a Tesla Model Y Long Range take to charge at Merrion Centre Car Park?
A typical 10–80% rapid charge takes about 70 min on the 50 kW CCS here, adding roughly 55 kWh. Estimates assume a typical charge curve and a warm battery.
How long does a Tesla Model 3 Rear-Wheel Drive take to charge at Merrion Centre Car Park?
A typical 10–80% rapid charge takes about 50 min on the 50 kW CCS here, adding roughly 40 kWh. Estimates assume a typical charge curve and a warm battery.
How long does an Audi Q4 e-tron 50 take to charge at Merrion Centre Car Park?
A typical 10–80% rapid charge takes about 66 min on the 50 kW CCS here, adding roughly 51 kWh. Estimates assume a typical charge curve and a warm battery.