Alfapower · EV charging site
The Junction at Horbury
Horbury, Ossett, WF4 5FH
The Junction at Horbury is an EV charging site in Ossett, City and Borough of Wakefield, run by Alfapower. Both of its sockets are 22 kW Type 2, and the price is listed as £0.25/kWh. 3 other charging sites are listed within a mile, and the nearest site with 50 kW or more is Arnold Clark Wakefield (Arnold Clark Dealer Network), 0.6 miles away.
Status
No live status
We don't have live status for this charger. Check it when you arrive.
Connectors
Site information
- Operator
- Alfapower
- Opening hours
- Not published
- Access
- Public
- Payment
- Pay at the charger (from Open Charge Map)
- Price
- £0.25/kWh(from Open Charge Map, 27 Feb 2019)
- Find it
- Street View of this spot ↗
Always check directly with the charge point operator for the most up-to-date information.
Reviews
No reviews yet. Be the first to rate this charger.
Common questions
How much does it cost to charge at The Junction at Horbury (Alfapower)?
The listed price is £0.25/kWh. Prices can change, so check the price at the charger before you start.
How fast is charging at The Junction at Horbury (Alfapower)?
Up to 22 kW AC via Type 2.
How many charging sockets does The Junction at Horbury (Alfapower) have?
2 charging sockets: 2 × 22 kW Type 2.
Who operates The Junction at Horbury?
The Junction at Horbury is on the Alfapower network.
Where is the nearest charger with 50 kW or more to The Junction at Horbury (Alfapower)?
Arnold Clark Wakefield (Arnold Clark Dealer Network) is 0.6 miles away in a straight line, with up to 150 kW. Check its live status before you set off.
How long does a Tesla Model Y Long Range take to charge at The Junction at Horbury (Alfapower)?
A 10–80% charge takes about 5h 2m on the 22 kW Type 2 here, adding roughly 55 kWh. Estimates assume a typical charge curve and a warm battery.
How long does a Tesla Model 3 Rear-Wheel Drive take to charge at The Junction at Horbury (Alfapower)?
A 10–80% charge takes about 3h 38m on the 22 kW Type 2 here, adding roughly 40 kWh. Estimates assume a typical charge curve and a warm battery.
How long does an Audi Q4 e-tron 50 take to charge at The Junction at Horbury (Alfapower)?
A 10–80% charge takes about 4h 39m on the 22 kW Type 2 here, adding roughly 51 kWh. Estimates assume a typical charge curve and a warm battery.
Chargers near this site
- Arnold Clark Wakefield
- Genie
- Horbury High Street
- Harratts Nissan Wakefield
- Toby Carvery Wakefield
- Asda Wakefield
- Cheapest nearby
- Toby Carvery Wakefield · 89p per kWh · 50 kW · 1.6 mi
- Fastest nearby
- Arnold Clark Wakefield · 150 kW · 0.6 mi