GeniePoint · EV charging site
Horbury High Street
High street Car Park, Ossett, WF4 5LE
Horbury High Street is an EV charging site in Ossett, City and Borough of Wakefield, run by GeniePoint. It has a single socket, with CHAdeMO and CCS at up to 50 kW, and the price is listed as Free to use until October 2021. 2 other charging sites are listed within a mile, and the nearest other site with 50 kW or more is Genie (GeniePoint), 60 yards away.
Status
No live status
We don't have live status for this charger. Check it when you arrive.
Connectors
Site information
- Operator
- GeniePoint
- Opening hours
- Not published
- Access
- Public · membership required · access key required
- Price
- Free to use until October 2021(from Open Charge Map, 28 Jul 2021)
- Phone (from Open Charge Map)
- +44 800 999 4240
- Notes
- £10.00 overstay fee after 75 mins, then £10.00 every subsequent 75 mins
- Getting there
- ev.engie.co.uk
- Find it
- Street View of this spot ↗
Always check directly with the charge point operator for the most up-to-date information.
Reviews
No reviews yet. Be the first to rate this charger.
Common questions
How much does it cost to charge at Horbury High Street (GeniePoint)?
The listed price is Free to use until October 2021. Prices can change, so check the price at the charger before you start.
How fast is charging at Horbury High Street (GeniePoint)?
Up to 50 kW DC via CHAdeMO, CCS, Type 2.
How many charging sockets does Horbury High Street (GeniePoint) have?
1 charging socket: 1 × 50 kW CHAdeMO, 1 × 50 kW CCS, 1 × 22 kW Type 2.
Who operates Horbury High Street?
Horbury High Street is on the GeniePoint network. For site issues, the operator lists +44 800 999 4240.
Where is the nearest other charger with 50 kW or more to Horbury High Street (GeniePoint)?
Genie (GeniePoint) is 60 yards away in a straight line, with up to 50 kW. Check its live status before you set off.
How long does a Tesla Model Y Long Range take to charge at Horbury High Street (GeniePoint)?
A typical 10–80% rapid charge takes about 70 min on the 50 kW CCS here, adding roughly 55 kWh. Estimates assume a typical charge curve and a warm battery.
How long does a Tesla Model 3 Rear-Wheel Drive take to charge at Horbury High Street (GeniePoint)?
A typical 10–80% rapid charge takes about 50 min on the 50 kW CCS here, adding roughly 40 kWh. Estimates assume a typical charge curve and a warm battery.
How long does an Audi Q4 e-tron 50 take to charge at Horbury High Street (GeniePoint)?
A typical 10–80% rapid charge takes about 66 min on the 50 kW CCS here, adding roughly 51 kWh. Estimates assume a typical charge curve and a warm battery.
Chargers near this site
- Genie
- The Junction at Horbury
- Arnold Clark Wakefield
- Holiday Inn Wakefield
- Wakefield, Goldsmith Avenue
- Towngate - Ossett
- Cheapest nearby
- Holiday Inn Wakefield · 56p per kWh · 200 kW · 1.5 mi
- Fastest nearby
- Wakefield, Goldsmith Avenue · 300 kW · 1.5 mi