Amp Map is in beta - data and features are still being developed. Any feedback is appreciated.Amp Map is in beta. Send feedback

Allego BV · EV charging site

Northfield Retail Park

Northfield Avenue, Kettering

Northfield Retail Park is an EV charging site in Kettering, North Northamptonshire, run by Allego BV. All 6 of its sockets are 200 kW CCS. 26 other charging sites are listed within a mile, and the nearest other site with 50 kW or more is Stanier Close (InstaVolt Ltd), 0.2 miles away.

Status

No live status

We don't have live status for this charger. Check it when you arrive.

Community dataThird-party data from Open Charge Map contributors. It may be out of date or inaccurate - check with the operator before relying on it.Last verified 16 Nov 2026Last verified 16 Nov 2026

Connectors

CCS · 200 kW6 connectors

Site information

Operator
Allego BV
Opening hours
Not published
Access
Public
Notes
Temporarily unavailable due to vandalism
Getting there
Next to the road entrance for Wickes, off Northfield Avenue, Kettering.

Always check directly with the charge point operator for the most up-to-date information.

Charge times by car

Charge window10–80%
Tesla Model Y Long Range 10–80% · 200 kW CCS~23 min
Tesla Model 3 Rear-Wheel Drive 10–80% · 200 kW CCS~23 min
Audi Q4 e-tron 50 10–80% · 200 kW CCS~39 min
Hyundai IONIQ 5 10–80% · 200 kW CCS~19 min
MG Motor MG4 Trophy 10–80% · 200 kW CCS~30 min
Hyundai Kona Electric Long Range 10–80% · 200 kW CCS~39 min

Estimates assume a typical charge curve and a warm battery.

Reviews

No reviews yet. Be the first to rate this charger.

Rate this charger

Common questions

How fast is charging at Northfield Retail Park (Allego BV)?

Up to 200 kW DC via CCS.

How many charging sockets does Northfield Retail Park (Allego BV) have?

6 charging sockets: 1 × 200 kW CCS, 1 × 200 kW CCS, 1 × 200 kW CCS, 1 × 200 kW CCS, 1 × 200 kW CCS, 1 × 200 kW CCS.

Who operates Northfield Retail Park?

Northfield Retail Park is on the Allego BV network.

Where is the nearest other charger with 50 kW or more to Northfield Retail Park (Allego BV)?

Stanier Close (InstaVolt Ltd) is 0.2 miles away in a straight line, with up to 160 kW. Check its live status before you set off.

How long does a Tesla Model Y Long Range take to charge at Northfield Retail Park (Allego BV)?

A typical 10–80% rapid charge takes about 23 min on the 200 kW CCS here, adding roughly 55 kWh. Estimates assume a typical charge curve and a warm battery.

How long does a Tesla Model 3 Rear-Wheel Drive take to charge at Northfield Retail Park (Allego BV)?

A typical 10–80% rapid charge takes about 23 min on the 200 kW CCS here, adding roughly 40 kWh. Estimates assume a typical charge curve and a warm battery.

How long does an Audi Q4 e-tron 50 take to charge at Northfield Retail Park (Allego BV)?

A typical 10–80% rapid charge takes about 39 min on the 200 kW CCS here, adding roughly 51 kWh. Estimates assume a typical charge curve and a warm battery.

Data: Open Charge Map · verified 16 Nov 2026