Allego BV · EV charging site
Northfield Retail Park
Northfield Avenue, Kettering
Northfield Retail Park is an EV charging site in Kettering, North Northamptonshire, run by Allego BV. All 6 of its sockets are 200 kW CCS. 26 other charging sites are listed within a mile, and the nearest other site with 50 kW or more is Stanier Close (InstaVolt Ltd), 0.2 miles away.
Status
No live status
We don't have live status for this charger. Check it when you arrive.
Connectors
Site information
- Operator
- Allego BV
- Opening hours
- Not published
- Access
- Public
- Notes
- Temporarily unavailable due to vandalism
- Getting there
- Next to the road entrance for Wickes, off Northfield Avenue, Kettering.
- Find it
- Street View of this spot ↗
Always check directly with the charge point operator for the most up-to-date information.
Reviews
No reviews yet. Be the first to rate this charger.
Common questions
How fast is charging at Northfield Retail Park (Allego BV)?
Up to 200 kW DC via CCS.
How many charging sockets does Northfield Retail Park (Allego BV) have?
6 charging sockets: 1 × 200 kW CCS, 1 × 200 kW CCS, 1 × 200 kW CCS, 1 × 200 kW CCS, 1 × 200 kW CCS, 1 × 200 kW CCS.
Who operates Northfield Retail Park?
Northfield Retail Park is on the Allego BV network.
Where is the nearest other charger with 50 kW or more to Northfield Retail Park (Allego BV)?
Stanier Close (InstaVolt Ltd) is 0.2 miles away in a straight line, with up to 160 kW. Check its live status before you set off.
How long does a Tesla Model Y Long Range take to charge at Northfield Retail Park (Allego BV)?
A typical 10–80% rapid charge takes about 23 min on the 200 kW CCS here, adding roughly 55 kWh. Estimates assume a typical charge curve and a warm battery.
How long does a Tesla Model 3 Rear-Wheel Drive take to charge at Northfield Retail Park (Allego BV)?
A typical 10–80% rapid charge takes about 23 min on the 200 kW CCS here, adding roughly 40 kWh. Estimates assume a typical charge curve and a warm battery.
How long does an Audi Q4 e-tron 50 take to charge at Northfield Retail Park (Allego BV)?
A typical 10–80% rapid charge takes about 39 min on the 200 kW CCS here, adding roughly 51 kWh. Estimates assume a typical charge curve and a warm battery.
Chargers near this site
- Cheapest nearby
- Bee Cool ACS · 89p per kWh · 50 kW · 0.3 mi