MFG EV Power · EV charging site
Morrisons Kettering
Lower Street, Kettering, NN16 8AN
Morrisons Kettering is an EV charging site in Kettering, North Northamptonshire, run by MFG EV Power. Both of its sockets are 50 kW CCS. 27 other charging sites are listed within a mile, and the nearest other site with 50 kW or more is Morrison’s Kettering (GeniePoint), 110 yards away.
Status
No live status
We don't have live status for this charger. Check it when you arrive.
Connectors
Site information
- Operator
- MFG EV Power
- Opening hours
- Not published
- Access
- Public
- Payment
- Pay at the charger (from Open Charge Map)
- Phone (from Open Charge Map)
- +44 20 8515 8559
- Find it
- Street View of this spot ↗
Facilities
Always check directly with the charge point operator for the most up-to-date information.
Reviews
No reviews yet. Be the first to rate this charger.
Common questions
How fast is charging at Morrisons Kettering (MFG EV Power)?
Up to 50 kW DC via CCS.
How many charging sockets does Morrisons Kettering (MFG EV Power) have?
2 charging sockets: 2 × 50 kW CCS.
Who operates Morrisons Kettering?
Morrisons Kettering is on the MFG EV Power network. For site issues, the operator lists +44 20 8515 8559.
Where is the nearest other charger with 50 kW or more to Morrisons Kettering (MFG EV Power)?
Morrison’s Kettering (GeniePoint) is 110 yards away in a straight line, with up to 50 kW. Check its live status before you set off.
How long does a Tesla Model Y Long Range take to charge at Morrisons Kettering (MFG EV Power)?
A typical 10–80% rapid charge takes about 70 min on the 50 kW CCS here, adding roughly 55 kWh. Estimates assume a typical charge curve and a warm battery.
How long does a Tesla Model 3 Rear-Wheel Drive take to charge at Morrisons Kettering (MFG EV Power)?
A typical 10–80% rapid charge takes about 50 min on the 50 kW CCS here, adding roughly 40 kWh. Estimates assume a typical charge curve and a warm battery.
How long does an Audi Q4 e-tron 50 take to charge at Morrisons Kettering (MFG EV Power)?
A typical 10–80% rapid charge takes about 66 min on the 50 kW CCS here, adding roughly 51 kWh. Estimates assume a typical charge curve and a warm battery.
Chargers near this site
- Fastest nearby
- Northfield Retail Park · 200 kW · 0.2 mi