Amp Map is in beta - data and features are still being developed. Any feedback is appreciated.Amp Map is in beta. Send feedback

Believ · EV charging site

Meadow Road

29 meadow Road, Kettering, NN16 8TL

Meadow Road is an EV charging site in Kettering, North Northamptonshire, run by Believ. Both of its sockets are 50 kW CCS. 23 other charging sites are listed within a mile, and the nearest other site with 50 kW or more is Morrison’s Kettering (GeniePoint), 0.2 miles away.

Status

No live status

We don't have live status for this charger. Check it when you arrive.

Closed dataBeliev has declined to share its charger data with Amp Map, so these details are third-party and may be out of date or inaccurate - check with the operator before relying on them.Last verified 20 Nov 2026Last verified 20 Nov 2026

Connectors

CCS · 50 kW2 connectors

Site information

Operator
Believ
Opening hours
Not published
Access
Public · membership required · access key required
Phone (from Open Charge Map)
0800 051 5335
Notes
Max 2 hours, No return 1 hour

Always check directly with the charge point operator for the most up-to-date information.

Charge times by car

Charge window10–80%
Tesla Model Y Long Range 10–80% · 50 kW CCS~70 min
Tesla Model 3 Rear-Wheel Drive 10–80% · 50 kW CCS~50 min
Audi Q4 e-tron 50 10–80% · 50 kW CCS~66 min
Hyundai IONIQ 5 10–80% · 50 kW CCS~64 min
MG Motor MG4 Trophy 10–80% · 50 kW CCS~55 min
Hyundai Kona Electric Long Range 10–80% · 50 kW CCS~55 min

Estimates assume a typical charge curve and a warm battery.

Reviews

No reviews yet. Be the first to rate this charger.

Rate this charger

Common questions

How fast is charging at Meadow Road (Believ)?

Up to 50 kW DC via CCS.

How many charging sockets does Meadow Road (Believ) have?

2 charging sockets: 2 × 50 kW CCS.

Who operates Meadow Road?

Meadow Road is on the Believ network. For site issues, the operator lists 0800 051 5335.

Where is the nearest other charger with 50 kW or more to Meadow Road (Believ)?

Morrison’s Kettering (GeniePoint) is 0.2 miles away in a straight line, with up to 50 kW. Check its live status before you set off.

How long does a Tesla Model Y Long Range take to charge at Meadow Road (Believ)?

A typical 10–80% rapid charge takes about 70 min on the 50 kW CCS here, adding roughly 55 kWh. Estimates assume a typical charge curve and a warm battery.

How long does a Tesla Model 3 Rear-Wheel Drive take to charge at Meadow Road (Believ)?

A typical 10–80% rapid charge takes about 50 min on the 50 kW CCS here, adding roughly 40 kWh. Estimates assume a typical charge curve and a warm battery.

How long does an Audi Q4 e-tron 50 take to charge at Meadow Road (Believ)?

A typical 10–80% rapid charge takes about 66 min on the 50 kW CCS here, adding roughly 51 kWh. Estimates assume a typical charge curve and a warm battery.

Data: Open Charge Map · verified 20 Nov 2026

Amp Map does not take payment. You pay the operator.