APCOA Parking · EV charging site
Reading Railway Station Car Park
Vastern Road, Reading, RG1 8BT
Reading Railway Station Car Park is an EV charging site in Reading, run by APCOA Parking. All 158 of its sockets are 7 kW Type 2, and the price is listed as £0.20/session + £0.34/kWh. 16 other charging sites are listed within a mile, and the nearest site with 50 kW or more is Rivermead Leisure Centre, 0.7 miles away.
Status
No live status
We don't have live status for this charger. Check it when you arrive.
Connectors
Site information
- Operator
- APCOA Parking
- Opening hours
- Not published
- Access
- Public
- Payment
- Pay at the charger (from Open Charge Map)
- Price
- £0.20/session + £0.34/kWh(from Open Charge Map, 4 Jun 2024)
- Find it
- Street View of this spot ↗
Facilities
Always check directly with the charge point operator for the most up-to-date information.
Reviews
No reviews yet. Be the first to rate this charger.
Common questions
How much does it cost to charge at Reading Railway Station Car Park (APCOA Parking)?
The listed price is £0.20/session + £0.34/kWh. Prices can change, so check the price at the charger before you start.
How fast is charging at Reading Railway Station Car Park (APCOA Parking)?
Up to 7 kW AC via Type 2.
How many charging sockets does Reading Railway Station Car Park (APCOA Parking) have?
158 charging sockets: 158 × 7 kW Type 2.
Who operates Reading Railway Station Car Park?
Reading Railway Station Car Park is on the APCOA Parking network.
Where is the nearest charger with 50 kW or more to Reading Railway Station Car Park (APCOA Parking)?
Rivermead Leisure Centre is 0.7 miles away in a straight line, with up to 150 kW. Check its live status before you set off.
How long does a Tesla Model Y Long Range take to charge at Reading Railway Station Car Park (APCOA Parking)?
A 10–80% charge takes about 7h 54m on the 7 kW Type 2 here, adding roughly 55 kWh. Estimates assume a typical charge curve and a warm battery.
How long does a Tesla Model 3 Rear-Wheel Drive take to charge at Reading Railway Station Car Park (APCOA Parking)?
A 10–80% charge takes about 5h 42m on the 7 kW Type 2 here, adding roughly 40 kWh. Estimates assume a typical charge curve and a warm battery.
How long does an Audi Q4 e-tron 50 take to charge at Reading Railway Station Car Park (APCOA Parking)?
A 10–80% charge takes about 7h 18m on the 7 kW Type 2 here, adding roughly 51 kWh. Estimates assume a typical charge curve and a warm battery.
Chargers near this site
- SSE Reading
- DRAX_00105
- Caversham Road
- Pod Point The Oracle Shopping Centre - Holy Brook Car Park (Chargers are located on the top level of the car park)
- Pod Point The Oracle Shopping Centre - The Riverside Car Park (Chargers are located on the top level of the car park)
- Reading Civic Centre, outside Car Park
- Cheapest nearby
- Pod Point The Oracle Shopping Centre - Holy Brook Car Park (Chargers are located on the top level of the car park) · 50.4p per kWh · 22 kW · 0.4 mi
- Fastest nearby
- Reading Civic Centre, outside Car Park · 44 kW · 0.5 mi