Arnold Clark Dealer Network · EV charging site
Arnold Clarke
Wheatley Hall Road, Doncaster, DN2 4GF
Arnold Clarke is an EV charging site in Doncaster, run by Arnold Clark Dealer Network. It has a single socket, with CCS at up to 150 kW, and the price is listed as £0.55/kWh. 3 other charging sites are listed within a mile, and the nearest other site with 50 kW or more is HU - Wheatley Doncaster (GRIDSERVE), 80 yards away.
Status
No live status
We don't have live status for this charger. Check it when you arrive.
Connectors
Site information
- Operator
- Arnold Clark Dealer Network
- Opening hours
- Not published
- Access
- Customers only
- Price
- £0.55/kWh(from Open Charge Map, 8 Apr 2026)
- Phone (from Open Charge Map)
- 01917434625
- Find it
- Street View of this spot ↗
Always check directly with the charge point operator for the most up-to-date information.
Reviews
No reviews yet. Be the first to rate this charger.
Common questions
How much does it cost to charge at Arnold Clarke (Arnold Clark Dealer Network)?
The listed price is £0.55/kWh. Prices can change, so check the price at the charger before you start.
How fast is charging at Arnold Clarke (Arnold Clark Dealer Network)?
Up to 150 kW DC via CCS, CHAdeMO.
How many charging sockets does Arnold Clarke (Arnold Clark Dealer Network) have?
1 charging socket: 8 × 150 kW CCS, 1 × 50 kW CHAdeMO.
Who operates Arnold Clarke?
Arnold Clarke is on the Arnold Clark Dealer Network network. For site issues, the operator lists 01917434625.
Can anyone charge at Arnold Clarke (Arnold Clark Dealer Network)?
The operator lists this charger for customers of the site.
Where is the nearest other charger with 50 kW or more to Arnold Clarke (Arnold Clark Dealer Network)?
HU - Wheatley Doncaster (GRIDSERVE) is 80 yards away in a straight line, with up to 180 kW. Check its live status before you set off.
How long does a Tesla Model Y Long Range take to charge at Arnold Clarke (Arnold Clark Dealer Network)?
A typical 10–80% rapid charge takes about 27 min on the 150 kW CCS here, adding roughly 55 kWh. Estimates assume a typical charge curve and a warm battery.
How long does a Tesla Model 3 Rear-Wheel Drive take to charge at Arnold Clarke (Arnold Clark Dealer Network)?
A typical 10–80% rapid charge takes about 24 min on the 150 kW CCS here, adding roughly 40 kWh. Estimates assume a typical charge curve and a warm battery.
How long does an Audi Q4 e-tron 50 take to charge at Arnold Clarke (Arnold Clark Dealer Network)?
A typical 10–80% rapid charge takes about 39 min on the 150 kW CCS here, adding roughly 51 kWh. Estimates assume a typical charge curve and a warm battery.
Chargers near this site
- HU - Wheatley Doncaster
- Argo Drive
- HU - Quest Park
- McDonalds
- Wool Market Car Park, Doncaster 1
- Doncaster Market
- Cheapest nearby
- HU - Wheatley Doncaster · 59p per kWh · 180 kW · 80 yd
- Fastest nearby
- HU - Quest Park · 360 kW · 0.7 mi