Amp Map is in beta - data and features are still being developed. Any feedback is appreciated.Amp Map is in beta. Send feedback

GRIDSERVE · EV charging site

HU - Wheatley Doncaster

Wheatley Centre Shopping Park, Doncaster, DN2 4PE

HU - Wheatley Doncaster is an EV charging site in Doncaster, run by GRIDSERVE and open 24 hours a day. Its 12 sockets reach up to 180 kW, with CCS at the top speed, and published prices run from £0.59 to £0.85 per kWh. Recorded live status shows it is usually busiest around noon, and Amp Map measured 82% uptime and recorded 172 charging sessions here over the last 30 days. 4 other charging sites are listed within a mile, and the nearest other site with 50 kW or more is Arnold Clarke (Arnold Clark Dealer Network), 80 yards away.

Status

5 of 12 available

Checking status…

VerifiedLive status and details from GRIDSERVE’s data feed. Amp Map updates them automatically.Last synced 22 Nov 2026

Connectors

CCS · 180 kW5 connectors · 85p per kWh2 out of service3 status unknown
#10% reliabilityStatus unknown
#20% reliabilityStatus unknown
#397% reliabilityStatus unknown
#517% reliabilityOut of order
#686% reliabilityOut of order
CHAdeMO · 80 kW1 connector · 85p per kWhStatus unknown
#413% reliabilityStatus unknown
Type 2 · 22 kW6 connectors · 59p per kWh5 free1 in use
#7100% reliabilityAvailable
#8100% reliabilityAvailable
#9100% reliabilityAvailable
#10100% reliabilityAvailable
#11100% reliabilityAvailable
#12100% reliabilityCharging

Reliability is the share of time each socket was not out of order, over the last 30 days.

Site information

Operator
GRIDSERVE
Opening hours
Open 24 hours
Parking
On-street
Payment
Bank card at the chargerIn the GRIDSERVE appRFID card

Facilities

CaféShoppingSupermarket

Always check directly with the charge point operator for the most up-to-date information.

Prices

ConnectorPowerPrice
CCS180 kW85p per kWh
CHAdeMO80 kW85p per kWh
Type 222 kW59p per kWh

Price at the charger, including VAT. Paying in the operator's app may cost less.

Charge times by car

Charge window10–80%
Tesla Model Y Long Range 10–80% · 180 kW CCS~24 min · ≈ 55 kWh · ~£47
Tesla Model 3 Rear-Wheel Drive 10–80% · 180 kW CCS~23 min · ≈ 40 kWh · ~£34
Audi Q4 e-tron 50 10–80% · 180 kW CCS~39 min · ≈ 51 kWh · ~£43
Hyundai IONIQ 5 10–80% · 180 kW CCS~20 min · ≈ 51 kWh · ~£43
MG Motor MG4 Trophy 10–80% · 180 kW CCS~30 min · ≈ 43 kWh · ~£36
Hyundai Kona Electric Long Range 10–80% · 180 kW CCS~39 min · ≈ 41 kWh · ~£35
Nissan LEAF 10–80% · 80 kW CHAdeMO~54 min · ≈ 28 kWh · ~£24

Estimates assume a typical charge curve and a warm battery.

Reviews

No reviews yet. Be the first to rate this charger.

Rate this charger

Common questions

How much does it cost to charge at HU - Wheatley Doncaster (GRIDSERVE)?

The listed price is CCS £0.85/kWh · CHAdeMO £0.85/kWh · Type 2 £0.59/kWh. Prices can change, so check the price at the charger before you start.

How fast is charging at HU - Wheatley Doncaster (GRIDSERVE)?

Up to 180 kW DC via CCS, CHAdeMO, Type 2.

How many charging sockets does HU - Wheatley Doncaster (GRIDSERVE) have?

12 charging sockets: 5 × 180 kW CCS, 1 × 80 kW CHAdeMO, 6 × 22 kW Type 2. Live per-socket availability is shown on this page.

Is HU - Wheatley Doncaster (GRIDSERVE) open 24/7?

Yes - HU - Wheatley Doncaster (GRIDSERVE) is open 24 hours a day, 7 days a week.

When is HU - Wheatley Doncaster (GRIDSERVE) busiest?

Measured from recorded socket occupancy across the week, it is typically busiest around noon and quietest around 11 pm. The live status on this page shows what is free before you set off.

How reliable is HU - Wheatley Doncaster (GRIDSERVE)?

Amp Map measured 82% uptime here from recorded live status over the last 30 days, across 172 observed charging sessions.

Who operates HU - Wheatley Doncaster?

HU - Wheatley Doncaster is on the GRIDSERVE network.

Where is the nearest other charger with 50 kW or more to HU - Wheatley Doncaster (GRIDSERVE)?

Arnold Clarke (Arnold Clark Dealer Network) is 80 yards away in a straight line, with up to 150 kW. Check its live status before you set off.

How long does a Tesla Model Y Long Range take to charge at HU - Wheatley Doncaster (GRIDSERVE)?

A typical 10–80% rapid charge takes about 24 min on the 180 kW CCS here, adding roughly 55 kWh (~£47 at the published price). Estimates assume a typical charge curve and a warm battery.

How long does a Tesla Model 3 Rear-Wheel Drive take to charge at HU - Wheatley Doncaster (GRIDSERVE)?

A typical 10–80% rapid charge takes about 23 min on the 180 kW CCS here, adding roughly 40 kWh (~£34 at the published price). Estimates assume a typical charge curve and a warm battery.

How long does an Audi Q4 e-tron 50 take to charge at HU - Wheatley Doncaster (GRIDSERVE)?

A typical 10–80% rapid charge takes about 39 min on the 180 kW CCS here, adding roughly 51 kWh (~£43 at the published price). Estimates assume a typical charge curve and a warm battery.

Data: GRIDSERVE · synced 22 Nov 2026

Amp Map does not take payment. You pay the operator.