GRIDSERVE · EV charging site
HU - Wheatley Doncaster
Wheatley Centre Shopping Park, Doncaster, DN2 4PE
HU - Wheatley Doncaster is an EV charging site in Doncaster, run by GRIDSERVE and open 24 hours a day. Its 12 sockets reach up to 180 kW, with CCS at the top speed, and published prices run from £0.59 to £0.85 per kWh. Recorded live status shows it is usually busiest around noon, and Amp Map measured 82% uptime and recorded 172 charging sessions here over the last 30 days. 4 other charging sites are listed within a mile, and the nearest other site with 50 kW or more is Arnold Clarke (Arnold Clark Dealer Network), 80 yards away.
Status
5 of 12 available
Checking status…
Connectors
CCS · 180 kW
CHAdeMO · 80 kW
Type 2 · 22 kW
Reliability is the share of time each socket was not out of order, over the last 30 days.
Site information
- Operator
- GRIDSERVE
- Opening hours
- Open 24 hours
- Parking
- On-street
- Payment
- Bank card at the chargerIn the GRIDSERVE appRFID card
- Find it
- Street View of this spot ↗
Facilities
Always check directly with the charge point operator for the most up-to-date information.
Prices
| Connector | Power | Price |
|---|---|---|
| CCS | 180 kW | 85p per kWh |
| CHAdeMO | 80 kW | 85p per kWh |
| Type 2 | 22 kW | 59p per kWh |
Price at the charger, including VAT. Paying in the operator's app may cost less.
Reviews
No reviews yet. Be the first to rate this charger.
Common questions
How much does it cost to charge at HU - Wheatley Doncaster (GRIDSERVE)?
The listed price is CCS £0.85/kWh · CHAdeMO £0.85/kWh · Type 2 £0.59/kWh. Prices can change, so check the price at the charger before you start.
How fast is charging at HU - Wheatley Doncaster (GRIDSERVE)?
Up to 180 kW DC via CCS, CHAdeMO, Type 2.
How many charging sockets does HU - Wheatley Doncaster (GRIDSERVE) have?
12 charging sockets: 5 × 180 kW CCS, 1 × 80 kW CHAdeMO, 6 × 22 kW Type 2. Live per-socket availability is shown on this page.
Is HU - Wheatley Doncaster (GRIDSERVE) open 24/7?
Yes - HU - Wheatley Doncaster (GRIDSERVE) is open 24 hours a day, 7 days a week.
When is HU - Wheatley Doncaster (GRIDSERVE) busiest?
Measured from recorded socket occupancy across the week, it is typically busiest around noon and quietest around 11 pm. The live status on this page shows what is free before you set off.
How reliable is HU - Wheatley Doncaster (GRIDSERVE)?
Amp Map measured 82% uptime here from recorded live status over the last 30 days, across 172 observed charging sessions.
Who operates HU - Wheatley Doncaster?
HU - Wheatley Doncaster is on the GRIDSERVE network.
Where is the nearest other charger with 50 kW or more to HU - Wheatley Doncaster (GRIDSERVE)?
Arnold Clarke (Arnold Clark Dealer Network) is 80 yards away in a straight line, with up to 150 kW. Check its live status before you set off.
How long does a Tesla Model Y Long Range take to charge at HU - Wheatley Doncaster (GRIDSERVE)?
A typical 10–80% rapid charge takes about 24 min on the 180 kW CCS here, adding roughly 55 kWh (~£47 at the published price). Estimates assume a typical charge curve and a warm battery.
How long does a Tesla Model 3 Rear-Wheel Drive take to charge at HU - Wheatley Doncaster (GRIDSERVE)?
A typical 10–80% rapid charge takes about 23 min on the 180 kW CCS here, adding roughly 40 kWh (~£34 at the published price). Estimates assume a typical charge curve and a warm battery.
How long does an Audi Q4 e-tron 50 take to charge at HU - Wheatley Doncaster (GRIDSERVE)?
A typical 10–80% rapid charge takes about 39 min on the 180 kW CCS here, adding roughly 51 kWh (~£43 at the published price). Estimates assume a typical charge curve and a warm battery.
Chargers near this site
- Fastest nearby
- HU - Quest Park · 360 kW · 0.7 mi