Asda Stevenage Supercentre is an EV charging site in Stevenage, Hertfordshire. It has a single socket, with CCS and CHAdeMO at up to 50 kW, and the price is listed as 30p/kWh. 18 other charging sites are listed within a mile, and the nearest other site with 50 kW or more is Solnet EV GB-SOL001001, 0.2 miles away.
Status
No live status
We don't have live status for this charger. Check it when you arrive.
Connectors
Site information
- Opening hours
- Not published
- Access
- Public
- Price
- 30p/kWh(from Open Charge Map, 18 Oct 2020)
- Getting there
- Asda supermarket. Charger located right outside main entrance 50kW CCS2/CHAdeMO @ 30p/kWh
- Find it
- Street View of this spot ↗
Facilities
Always check directly with the charge point operator for the most up-to-date information.
Reviews
No reviews yet. Be the first to rate this charger.
Common questions
How much does it cost to charge at Asda Stevenage Supercentre?
The listed price is 30p/kWh. Prices can change, so check the price at the charger before you start.
How fast is charging at Asda Stevenage Supercentre?
Up to 50 kW DC via CCS, CHAdeMO.
How many charging sockets does Asda Stevenage Supercentre have?
1 charging socket: 1 × 50 kW CCS, 1 × 50 kW CHAdeMO.
Where is the nearest other charger with 50 kW or more to Asda Stevenage Supercentre?
Solnet EV GB-SOL001001 is 0.2 miles away in a straight line, with up to 160 kW. Check its live status before you set off.
How long does a Tesla Model Y Long Range take to charge at Asda Stevenage Supercentre?
A typical 10–80% rapid charge takes about 70 min on the 50 kW CCS here, adding roughly 55 kWh. Estimates assume a typical charge curve and a warm battery.
How long does a Tesla Model 3 Rear-Wheel Drive take to charge at Asda Stevenage Supercentre?
A typical 10–80% rapid charge takes about 50 min on the 50 kW CCS here, adding roughly 40 kWh. Estimates assume a typical charge curve and a warm battery.
How long does an Audi Q4 e-tron 50 take to charge at Asda Stevenage Supercentre?
A typical 10–80% rapid charge takes about 66 min on the 50 kW CCS here, adding roughly 51 kWh. Estimates assume a typical charge curve and a warm battery.
Chargers near this site
- Pod Point North Hertfordshire College
- Solnet EV GB-SOL001001
- St Georges Way MSCP South Level Four 1
- St Georges Way MSCP North Level Four 2
- HU - Monkswood Retail Park
- Stevenage Leisure Park, UK
- Cheapest nearby
- Stevenage Leisure Park, UK · 37p per kWh · 250 kW · 0.3 mi
- Fastest nearby
- Stevenage Leisure Park, UK · 250 kW · 0.3 mi