EV charging site
Solnet EV GB-SOL001001
4 Modular Business Park, Stevenage, SG1 2FZ
Solnet EV GB-SOL001001 is an EV charging site in Stevenage, Hertfordshire. Both of its sockets are 160 kW CCS, and the price is listed as £0.59/kWh. 18 other charging sites are listed within a mile, and the nearest other site with 50 kW or more is Stevenage Leisure Park, UK (Tesla), 0.2 miles away.
Status
No live status
We don't have live status for this charger. Check it when you arrive.
Connectors
Site information
- Opening hours
- Not published
- Access
- Public
- Payment
- Pay at the charger (from Open Charge Map)
- Price
- £0.59/kWh(from Open Charge Map, 21 Jan 2024)
- Phone (from Open Charge Map)
- 01438419889
- Getting there
- No restrictions, free parking while charging
- Find it
- Street View of this spot ↗
Always check directly with the charge point operator for the most up-to-date information.
Reviews
No reviews yet. Be the first to rate this charger.
Common questions
How much does it cost to charge at Solnet EV GB-SOL001001?
The listed price is £0.59/kWh. Prices can change, so check the price at the charger before you start.
How fast is charging at Solnet EV GB-SOL001001?
Up to 160 kW DC via CCS.
How many charging sockets does Solnet EV GB-SOL001001 have?
2 charging sockets: 2 × 160 kW CCS.
Where is the nearest other charger with 50 kW or more to Solnet EV GB-SOL001001?
Stevenage Leisure Park, UK (Tesla) is 0.2 miles away in a straight line, with up to 250 kW. Check its live status before you set off.
How long does a Tesla Model Y Long Range take to charge at Solnet EV GB-SOL001001?
A typical 10–80% rapid charge takes about 26 min on the 160 kW CCS here, adding roughly 55 kWh. Estimates assume a typical charge curve and a warm battery.
How long does a Tesla Model 3 Rear-Wheel Drive take to charge at Solnet EV GB-SOL001001?
A typical 10–80% rapid charge takes about 23 min on the 160 kW CCS here, adding roughly 40 kWh. Estimates assume a typical charge curve and a warm battery.
How long does an Audi Q4 e-tron 50 take to charge at Solnet EV GB-SOL001001?
A typical 10–80% rapid charge takes about 39 min on the 160 kW CCS here, adding roughly 51 kWh. Estimates assume a typical charge curve and a warm battery.
Chargers near this site
- Pod Point North Hertfordshire College
- Stevenage Leisure Park, UK
- Asda Stevenage Supercentre
- LG Stevenage
- Hertfordshire County Council - Farnham House Underground Car Park
- HU - Monkswood Retail Park
- Cheapest nearby
- Pod Point North Hertfordshire College · 44.4p per kWh · 7 kW · 0.2 mi
- Fastest nearby
- Stevenage Leisure Park, UK · 250 kW · 0.2 mi