Amp Map is in beta - data and features are still being developed. Any feedback is appreciated.Amp Map is in beta. Send feedback

Be.EV · EV charging site

Costa Bramingham Business Park

Enterprise Way, Luton, LU3 4BW

Costa Bramingham Business Park is an EV charging site in Luton, run by Be.EV and open 24 hours a day. Both of its sockets are 50 kW CCS, and the published price is £0.89 per kWh. Recorded live status shows it is usually busiest around 7 pm, and Amp Map measured 100% uptime and recorded 96 charging sessions here over the last 30 days. 3 other charging sites are listed within a mile, and the nearest other site with 50 kW or more is Aldi Bramingham Business Park (Be.EV), 130 yards away.

Status

1 of 2 available

Checking status…

VerifiedLive status and details from Be.EV’s data feed. Amp Map updates them automatically.Last synced 21 Nov 2026

Connectors

CCS · 50 kW2 connectors · 89p per kWh1 free1 in use
KM0045-01100% reliabilityAvailable
KM0045-02100% reliabilityCharging

Reliability is the share of time each socket was not out of order, over the last 30 days.

Site information

Operator
Be.EV
Opening hours
Mon–Fri 06:00–22:00Sat 07:00–22:00Sun 07:00–18:30No charging outside opening hours
Parking
Car park
Payment
In the Be.EV app
Charger ID
KM0045-01

Always check directly with the charge point operator for the most up-to-date information.

Prices

ConnectorPowerPrice
CCS50 kW89p per kWh

Price at the charger, including VAT. Paying in the operator's app may cost less.

Charge times by car

Charge window10–80%
Tesla Model Y Long Range 10–80% · 50 kW CCS~70 min · ≈ 55 kWh · ~£49
Tesla Model 3 Rear-Wheel Drive 10–80% · 50 kW CCS~50 min · ≈ 40 kWh · ~£36
Audi Q4 e-tron 50 10–80% · 50 kW CCS~66 min · ≈ 51 kWh · ~£45
Hyundai IONIQ 5 10–80% · 50 kW CCS~64 min · ≈ 51 kWh · ~£45
MG Motor MG4 Trophy 10–80% · 50 kW CCS~55 min · ≈ 43 kWh · ~£38
Hyundai Kona Electric Long Range 10–80% · 50 kW CCS~55 min · ≈ 41 kWh · ~£36

Estimates assume a typical charge curve and a warm battery.

Reviews

No reviews yet. Be the first to rate this charger.

Rate this charger

Common questions

How much does it cost to charge at Costa Bramingham Business Park (Be.EV)?

The listed price is £0.89/kWh. Prices can change, so check the price at the charger before you start.

How fast is charging at Costa Bramingham Business Park (Be.EV)?

Up to 50 kW DC via CCS.

How many charging sockets does Costa Bramingham Business Park (Be.EV) have?

2 charging sockets: 2 × 50 kW CCS. Live per-socket availability is shown on this page.

Is Costa Bramingham Business Park (Be.EV) open 24/7?

Yes - Costa Bramingham Business Park (Be.EV) is open 24 hours a day, 7 days a week.

When is Costa Bramingham Business Park (Be.EV) busiest?

Measured from recorded socket occupancy across the week, it is typically busiest around 7 pm and quietest around 6 am. The live status on this page shows what is free before you set off.

How reliable is Costa Bramingham Business Park (Be.EV)?

Amp Map measured 100% uptime here from recorded live status over the last 30 days, across 96 observed charging sessions.

Who operates Costa Bramingham Business Park?

Costa Bramingham Business Park is on the Be.EV network.

Where is the nearest other charger with 50 kW or more to Costa Bramingham Business Park (Be.EV)?

Aldi Bramingham Business Park (Be.EV) is 130 yards away in a straight line, with up to 50 kW. Check its live status before you set off.

How long does a Tesla Model Y Long Range take to charge at Costa Bramingham Business Park (Be.EV)?

A typical 10–80% rapid charge takes about 70 min on the 50 kW CCS here, adding roughly 55 kWh (~£49 at the published price). Estimates assume a typical charge curve and a warm battery.

How long does a Tesla Model 3 Rear-Wheel Drive take to charge at Costa Bramingham Business Park (Be.EV)?

A typical 10–80% rapid charge takes about 50 min on the 50 kW CCS here, adding roughly 40 kWh (~£36 at the published price). Estimates assume a typical charge curve and a warm battery.

How long does an Audi Q4 e-tron 50 take to charge at Costa Bramingham Business Park (Be.EV)?

A typical 10–80% rapid charge takes about 66 min on the 50 kW CCS here, adding roughly 51 kWh (~£45 at the published price). Estimates assume a typical charge curve and a warm battery.

Data: Be.EV · synced 21 Nov 2026

Amp Map does not take payment. You pay the operator.