Amp Map is in beta - data and features are still being developed. Any feedback is appreciated.Amp Map is in beta. Send feedback

Be.EV · EV charging site

Homebase Bramingham Business Park

Enterprise Way, Luton, LU3 4BW

Homebase Bramingham Business Park is an EV charging site in Luton, run by Be.EV. All 4 of its sockets are 22 kW Type 2, and the published price is £0.59 per kWh. Recorded live status shows it is usually busiest around 3 pm, and Amp Map measured 100% uptime and recorded 54 charging sessions here over the last 30 days. 3 other charging sites are listed within a mile, and the nearest site with 50 kW or more is Costa Bramingham Business Park (Be.EV), 10 yards away.

Status

4 of 4 available

Checking status…

VerifiedLive status and details from Be.EV’s data feed. Amp Map updates them automatically.Last synced 20 Nov 2026

Connectors

Type 2 · 22 kW4 connectors · 59p per kWh4 free
AD00139-1100% reliabilityAvailable
AD00139-2100% reliabilityAvailable
AD00142-1100% reliabilityAvailable
AD00142-2100% reliabilityAvailable

Reliability is the share of time each socket was not out of order, over the last 30 days.

Site information

Operator
Be.EV
Opening hours
Mon–Fri 06:00–22:00Sat 07:00–22:00Sun 07:00–18:30No charging outside opening hours
Parking
Car park
Payment
In the Be.EV app
Charger ID
AD00139-1

Always check directly with the charge point operator for the most up-to-date information.

Prices

ConnectorPowerPrice
Type 222 kW59p per kWh

Price at the charger, including VAT. Paying in the operator's app may cost less.

Charge times by car

Charge window10–80%
Tesla Model Y Long Range 10–80% · 22 kW Type 2~5h 2m · ≈ 55 kWh · ~£33
Tesla Model 3 Rear-Wheel Drive 10–80% · 22 kW Type 2~3h 38m · ≈ 40 kWh · ~£24
Audi Q4 e-tron 50 10–80% · 22 kW Type 2~4h 39m · ≈ 51 kWh · ~£30
Hyundai IONIQ 5 10–80% · 22 kW Type 2~4h 37m · ≈ 51 kWh · ~£30
MG Motor MG4 Trophy 10–80% · 22 kW Type 2~3h 53m · ≈ 43 kWh · ~£25
Hyundai Kona Electric Long Range 10–80% · 22 kW Type 2~5h 38m · ≈ 41 kWh · ~£24
Nissan LEAF 10–80% · 22 kW Type 2~4h 15m · ≈ 28 kWh · ~£17

Estimates assume a typical charge curve and a warm battery.

Reviews

No reviews yet. Be the first to rate this charger.

Rate this charger

Common questions

How much does it cost to charge at Homebase Bramingham Business Park (Be.EV)?

The listed price is £0.59/kWh. Prices can change, so check the price at the charger before you start.

How fast is charging at Homebase Bramingham Business Park (Be.EV)?

Up to 22 kW AC via Type 2.

How many charging sockets does Homebase Bramingham Business Park (Be.EV) have?

4 charging sockets: 4 × 22 kW Type 2. Live per-socket availability is shown on this page.

When is Homebase Bramingham Business Park (Be.EV) open?

Opening hours: Mon–Fri 06:00–22:00; Sat 07:00–22:00; Sun 07:00–18:30.

When is Homebase Bramingham Business Park (Be.EV) busiest?

Measured from recorded socket occupancy across the week, it is typically busiest around 3 pm and quietest around 11 pm. The live status on this page shows what is free before you set off.

How reliable is Homebase Bramingham Business Park (Be.EV)?

Amp Map measured 100% uptime here from recorded live status over the last 30 days, across 54 observed charging sessions.

Who operates Homebase Bramingham Business Park?

Homebase Bramingham Business Park is on the Be.EV network.

Where is the nearest charger with 50 kW or more to Homebase Bramingham Business Park (Be.EV)?

Costa Bramingham Business Park (Be.EV) is 10 yards away in a straight line, with up to 50 kW. Check its live status before you set off.

How long does a Tesla Model Y Long Range take to charge at Homebase Bramingham Business Park (Be.EV)?

A 10–80% charge takes about 5h 2m on the 22 kW Type 2 here, adding roughly 55 kWh (~£33 at the published price). Estimates assume a typical charge curve and a warm battery.

How long does a Tesla Model 3 Rear-Wheel Drive take to charge at Homebase Bramingham Business Park (Be.EV)?

A 10–80% charge takes about 3h 38m on the 22 kW Type 2 here, adding roughly 40 kWh (~£24 at the published price). Estimates assume a typical charge curve and a warm battery.

How long does an Audi Q4 e-tron 50 take to charge at Homebase Bramingham Business Park (Be.EV)?

A 10–80% charge takes about 4h 39m on the 22 kW Type 2 here, adding roughly 51 kWh (~£30 at the published price). Estimates assume a typical charge curve and a warm battery.

Data: Be.EV · synced 20 Nov 2026

Amp Map does not take payment. You pay the operator.