Amp Map is in beta - data and features are still being developed. Any feedback is appreciated.Amp Map is in beta. Send feedback

Be.EV · EV charging site

Etihad Campus - Cycling Centre

Etihad Campus, Failsworth, M11 4DQ

Etihad Campus - Cycling Centre is an EV charging site in Failsworth, Borough of Oldham, run by Be.EV and open 24 hours a day. Both of its sockets are 7 kW Type 2, and the published price is £0.59 per kWh. Recorded live status shows it is usually busiest around 11 am, and Amp Map measured 90% uptime and recorded 133 charging sessions here over the last 30 days. 6 other charging sites are listed within a mile, and the nearest site with 50 kW or more is Manchester Regional Tennis Centre (Be.EV), 0.5 miles away.

Status

2 of 2 available

Checking status…

VerifiedLive status and details from Be.EV’s data feed. Amp Map updates them automatically.Last synced 21 Nov 2026

Connectors

Type 2 · 7 kW2 connectors · 59p per kWh2 free
BVFGM0102-A100% reliabilityAvailable
BVFGM0102-B81% reliabilityAvailable

Reliability is the share of time each socket was not out of order, over the last 30 days.

Site information

Operator
Be.EV
Opening hours
Open 24 hours
Parking
Car park
Payment
In the Be.EV appRFID card
Charger ID
BVFGM0102-A

Always check directly with the charge point operator for the most up-to-date information.

Prices

ConnectorPowerPrice
Type 27 kW59p per kWh

Price at the charger, including VAT. Paying in the operator's app may cost less.

Charge times by car

Charge window10–80%
Tesla Model Y Long Range 10–80% · 7 kW Type 2~7h 54m · ≈ 55 kWh · ~£33
Tesla Model 3 Rear-Wheel Drive 10–80% · 7 kW Type 2~5h 42m · ≈ 40 kWh · ~£24
Audi Q4 e-tron 50 10–80% · 7 kW Type 2~7h 18m · ≈ 51 kWh · ~£30
Hyundai IONIQ 5 10–80% · 7 kW Type 2~7h 16m · ≈ 51 kWh · ~£30
MG Motor MG4 Trophy 10–80% · 7 kW Type 2~6h 6m · ≈ 43 kWh · ~£25
Hyundai Kona Electric Long Range 10–80% · 7 kW Type 2~5h 48m · ≈ 41 kWh · ~£24
Nissan LEAF 10–80% · 7 kW Type 2~4h 15m · ≈ 28 kWh · ~£17

Estimates assume a typical charge curve and a warm battery.

Reviews

No reviews yet. Be the first to rate this charger.

Rate this charger

Common questions

How much does it cost to charge at Etihad Campus - Cycling Centre (Be.EV)?

The listed price is £0.59/kWh. Prices can change, so check the price at the charger before you start.

How fast is charging at Etihad Campus - Cycling Centre (Be.EV)?

Up to 7 kW AC via Type 2.

How many charging sockets does Etihad Campus - Cycling Centre (Be.EV) have?

2 charging sockets: 2 × 7 kW Type 2. Live per-socket availability is shown on this page.

Is Etihad Campus - Cycling Centre (Be.EV) open 24/7?

Yes - Etihad Campus - Cycling Centre (Be.EV) is open 24 hours a day, 7 days a week.

When is Etihad Campus - Cycling Centre (Be.EV) busiest?

Measured from recorded socket occupancy across the week, it is typically busiest around 11 am and quietest around 6 am. The live status on this page shows what is free before you set off.

How reliable is Etihad Campus - Cycling Centre (Be.EV)?

Amp Map measured 90% uptime here from recorded live status over the last 30 days, across 133 observed charging sessions.

Who operates Etihad Campus - Cycling Centre?

Etihad Campus - Cycling Centre is on the Be.EV network.

Where is the nearest charger with 50 kW or more to Etihad Campus - Cycling Centre (Be.EV)?

Manchester Regional Tennis Centre (Be.EV) is 0.5 miles away in a straight line, with up to 51 kW. Check its live status before you set off.

How long does a Tesla Model Y Long Range take to charge at Etihad Campus - Cycling Centre (Be.EV)?

A 10–80% charge takes about 7h 54m on the 7 kW Type 2 here, adding roughly 55 kWh (~£33 at the published price). Estimates assume a typical charge curve and a warm battery.

How long does a Tesla Model 3 Rear-Wheel Drive take to charge at Etihad Campus - Cycling Centre (Be.EV)?

A 10–80% charge takes about 5h 42m on the 7 kW Type 2 here, adding roughly 40 kWh (~£24 at the published price). Estimates assume a typical charge curve and a warm battery.

How long does an Audi Q4 e-tron 50 take to charge at Etihad Campus - Cycling Centre (Be.EV)?

A 10–80% charge takes about 7h 18m on the 7 kW Type 2 here, adding roughly 51 kWh (~£30 at the published price). Estimates assume a typical charge curve and a warm battery.

Data: Be.EV · synced 21 Nov 2026

Amp Map does not take payment. You pay the operator.