Amp Map is in beta - data and features are still being developed. Any feedback is appreciated.Amp Map is in beta. Send feedback

Tesla · EV charging site

Manchester, UK - Ashton New Road

185, Ashton New Road, Manchester, M11 3RR

Manchester, UK - Ashton New Road is an EV charging site in Manchester, run by Tesla and open 24 hours a day. All 12 of its sockets are 250 kW CCS, and published prices run from £0.37 to £0.62 per kWh. Recorded live status shows it is usually busiest around 7 am, and Amp Map measured 98% uptime and recorded 5037 charging sessions here over the last 30 days. 10 other charging sites are listed within a mile, and the nearest other site with 50 kW or more is Manchester Regional Tennis Centre (Be.EV), 0.3 miles away.

Status

6 of 12 available

Checking status…

VerifiedLive status and details from Tesla’s data feed. Amp Map updates them automatically.Last synced 20 Nov 2026

Connectors

CCS · 250 kW12 connectors · 53p per kWh6 free6 in use
1A99% reliabilityCharging
1B100% reliabilityAvailable
1C100% reliabilityCharging
1D100% reliabilityAvailable
2A100% reliabilityCharging
2B96% reliabilityAvailable
2C91% reliabilityCharging
2D93% reliabilityAvailable

Reliability is the share of time each socket was not out of order, over the last 30 days.

Site information

Operator
Tesla
Opening hours
Open 24 hours
Payment
Contactless card at the chargerIn the Tesla app
Charger ID
1A
Owner
Tesla, Inc.

Always check directly with the charge point operator for the most up-to-date information.

Prices

Price times

RateHoursPriceCurrent
Off-peak00:00–09:00£0.37/kWh
Peak09:00–19:00£0.62/kWh
Standard19:00–23:00£0.53/kWh
Off-peak23:00–00:00£0.37/kWh

Price at the charger, including VAT. Paying in the operator's app may cost less.

Charge times by car

Charge window10–80%
Tesla Model Y Long Range 10–80% · 250 kW CCS~22 min · ≈ 55 kWh · ~£29
Tesla Model 3 Rear-Wheel Drive 10–80% · 250 kW CCS~23 min · ≈ 40 kWh · ~£21
Audi Q4 e-tron 50 10–80% · 250 kW CCS~39 min · ≈ 51 kWh · ~£27
Hyundai IONIQ 5 10–80% · 250 kW CCS~18 min · ≈ 51 kWh · ~£27
MG Motor MG4 Trophy 10–80% · 250 kW CCS~30 min · ≈ 43 kWh · ~£23
Hyundai Kona Electric Long Range 10–80% · 250 kW CCS~39 min · ≈ 41 kWh · ~£22

Estimates assume a typical charge curve and a warm battery.

Reviews

No reviews yet. Be the first to rate this charger.

Rate this charger

Common questions

How much does it cost to charge at Manchester, UK - Ashton New Road (Tesla)?

The listed price is £0.37–£0.62/kWh · varies by time of day. Prices can change, so check the price at the charger before you start.

How fast is charging at Manchester, UK - Ashton New Road (Tesla)?

Up to 250 kW DC via CCS.

How many charging sockets does Manchester, UK - Ashton New Road (Tesla) have?

12 charging sockets: 12 × 250 kW CCS. Live per-socket availability is shown on this page.

Is Manchester, UK - Ashton New Road (Tesla) open 24/7?

Yes - Manchester, UK - Ashton New Road (Tesla) is open 24 hours a day, 7 days a week.

When is Manchester, UK - Ashton New Road (Tesla) busiest?

Measured from recorded socket occupancy across the week, it is typically busiest around 7 am and quietest around 11 pm. The live status on this page shows what is free before you set off.

How reliable is Manchester, UK - Ashton New Road (Tesla)?

Amp Map measured 98% uptime here from recorded live status over the last 30 days, across 5037 observed charging sessions.

Who operates Manchester, UK - Ashton New Road?

Manchester, UK - Ashton New Road is on the Tesla network.

Where is the nearest other charger with 50 kW or more to Manchester, UK - Ashton New Road (Tesla)?

Manchester Regional Tennis Centre (Be.EV) is 0.3 miles away in a straight line, with up to 51 kW. Check its live status before you set off.

How long does a Tesla Model Y Long Range take to charge at Manchester, UK - Ashton New Road (Tesla)?

A typical 10–80% rapid charge takes about 22 min on the 250 kW CCS here, adding roughly 55 kWh (~£29 at the published price). Estimates assume a typical charge curve and a warm battery.

How long does a Tesla Model 3 Rear-Wheel Drive take to charge at Manchester, UK - Ashton New Road (Tesla)?

A typical 10–80% rapid charge takes about 23 min on the 250 kW CCS here, adding roughly 40 kWh (~£21 at the published price). Estimates assume a typical charge curve and a warm battery.

How long does an Audi Q4 e-tron 50 take to charge at Manchester, UK - Ashton New Road (Tesla)?

A typical 10–80% rapid charge takes about 39 min on the 250 kW CCS here, adding roughly 51 kWh (~£27 at the published price). Estimates assume a typical charge curve and a warm battery.

Data: Tesla · synced 20 Nov 2026

Amp Map does not take payment. You pay the operator.