Amp Map is in beta - data and features are still being developed. Any feedback is appreciated.Amp Map is in beta. Send feedback

Be.EV · EV charging site

Harrogate Street

Harrogate Street, Wigan, WN1 1XQ

Harrogate Street is an EV charging site in Wigan, Borough of Wigan, run by Be.EV and open 24 hours a day. Its 3 sockets reach up to 50 kW, with CCS and CHAdeMO at the top speed, and published prices run from £0.59 to £0.77 per kWh. Recorded live status shows it is usually busiest around 10 am, and Amp Map measured 96% uptime and recorded 136 charging sessions here over the last 30 days. 10 other charging sites are listed within a mile, and the nearest other site with 50 kW or more is Chorley Nissan Wigan (Nissan UK Dealer Network), 0.6 miles away.

Status

1 of 3 available

Checking status…

VerifiedLive status and details from Be.EV’s data feed. Amp Map updates them automatically.Last synced 21 Nov 2026

Connectors

CCS · 50 kW1 connector · 77p per kWh1 in use
BVRGM0015-1100% reliabilityCharging
CHAdeMO · 50 kW1 connector · 77p per kWh1 free
BVRGM0015-288% reliabilityAvailable
Type 2 · 11 kW1 connector · 59p per kWh1 in use
BVRGM0015-3100% reliabilityCharging

Reliability is the share of time each socket was not out of order, over the last 30 days.

Site information

Operator
Be.EV
Opening hours
Open 24 hours
Parking
Car park
Payment
In the Be.EV appRFID card
Charger ID
BVRGM0015-1

Always check directly with the charge point operator for the most up-to-date information.

Prices

ConnectorPowerPrice
CCS50 kW77p per kWh
CHAdeMO50 kW77p per kWh
Type 211 kW59p per kWh

Price at the charger, including VAT. Paying in the operator's app may cost less.

Charge times by car

Charge window10–80%
Tesla Model Y Long Range 10–80% · 50 kW CCS~70 min · ≈ 55 kWh · ~£43
Tesla Model 3 Rear-Wheel Drive 10–80% · 50 kW CCS~50 min · ≈ 40 kWh · ~£31
Audi Q4 e-tron 50 10–80% · 50 kW CCS~66 min · ≈ 51 kWh · ~£39
Hyundai IONIQ 5 10–80% · 50 kW CCS~64 min · ≈ 51 kWh · ~£39
MG Motor MG4 Trophy 10–80% · 50 kW CCS~55 min · ≈ 43 kWh · ~£33
Hyundai Kona Electric Long Range 10–80% · 50 kW CCS~55 min · ≈ 41 kWh · ~£31
Nissan LEAF 10–80% · 50 kW CHAdeMO~55 min · ≈ 28 kWh · ~£22

Estimates assume a typical charge curve and a warm battery.

Reviews

No reviews yet. Be the first to rate this charger.

Rate this charger

Common questions

How much does it cost to charge at Harrogate Street (Be.EV)?

The listed price is CCS £0.77/kWh · CHAdeMO £0.77/kWh · Type 2 £0.59/kWh. Prices can change, so check the price at the charger before you start.

How fast is charging at Harrogate Street (Be.EV)?

Up to 50 kW DC via CCS, CHAdeMO, Type 2.

How many charging sockets does Harrogate Street (Be.EV) have?

3 charging sockets: 1 × 50 kW CCS, 1 × 50 kW CHAdeMO, 1 × 11 kW Type 2. Live per-socket availability is shown on this page.

Is Harrogate Street (Be.EV) open 24/7?

Yes - Harrogate Street (Be.EV) is open 24 hours a day, 7 days a week.

When is Harrogate Street (Be.EV) busiest?

Measured from recorded socket occupancy across the week, it is typically busiest around 10 am and quietest around 11 pm. The live status on this page shows what is free before you set off.

How reliable is Harrogate Street (Be.EV)?

Amp Map measured 96% uptime here from recorded live status over the last 30 days, across 136 observed charging sessions.

Who operates Harrogate Street?

Harrogate Street is on the Be.EV network.

Where is the nearest other charger with 50 kW or more to Harrogate Street (Be.EV)?

Chorley Nissan Wigan (Nissan UK Dealer Network) is 0.6 miles away in a straight line, with up to 50 kW. Check its live status before you set off.

How long does a Tesla Model Y Long Range take to charge at Harrogate Street (Be.EV)?

A typical 10–80% rapid charge takes about 70 min on the 50 kW CCS here, adding roughly 55 kWh (~£43 at the published price). Estimates assume a typical charge curve and a warm battery.

How long does a Tesla Model 3 Rear-Wheel Drive take to charge at Harrogate Street (Be.EV)?

A typical 10–80% rapid charge takes about 50 min on the 50 kW CCS here, adding roughly 40 kWh (~£31 at the published price). Estimates assume a typical charge curve and a warm battery.

How long does an Audi Q4 e-tron 50 take to charge at Harrogate Street (Be.EV)?

A typical 10–80% rapid charge takes about 66 min on the 50 kW CCS here, adding roughly 51 kWh (~£39 at the published price). Estimates assume a typical charge curve and a warm battery.

Data: Be.EV · synced 21 Nov 2026

Amp Map does not take payment. You pay the operator.