Nissan UK Dealer Network · EV charging site
Chorley Nissan Wigan
Pottery Road, Wigan, WN3 5AA
Chorley Nissan Wigan is an EV charging site in Wigan, Borough of Wigan, run by Nissan UK Dealer Network. Its 2 sockets reach up to 50 kW, with CHAdeMO at the top speed, and charging is listed as free. 12 other charging sites are listed within a mile, and the nearest other site with 50 kW or more is Chorley Group Wigan Nissan (Alfapower), 0.1 miles away.
Status
No live status
We don't have live status for this charger. Check it when you arrive.
Connectors
Site information
- Operator
- Nissan UK Dealer Network
- Opening hours
- Not published
- Access
- Public · notice required
- Price
- Free(from Open Charge Map, 9 Jul 2018)
- Phone (from Open Charge Map)
- +44 1942 820233
- Getting there
- Nissan dealer, open dealership hours only. Type 2 AC charge points are Pod-Point units
- Find it
- Street View of this spot ↗
Always check directly with the charge point operator for the most up-to-date information.
Reviews
No reviews yet. Be the first to rate this charger.
Common questions
How much does it cost to charge at Chorley Nissan Wigan (Nissan UK Dealer Network)?
The listed price is Free. Prices can change, so check the price at the charger before you start.
How fast is charging at Chorley Nissan Wigan (Nissan UK Dealer Network)?
Up to 50 kW DC via CHAdeMO, Type 2.
How many charging sockets does Chorley Nissan Wigan (Nissan UK Dealer Network) have?
2 charging sockets: 1 × 50 kW CHAdeMO, 2 × 7 kW Type 2.
Who operates Chorley Nissan Wigan?
Chorley Nissan Wigan is on the Nissan UK Dealer Network network. For site issues, the operator lists +44 1942 820233.
Where is the nearest other charger with 50 kW or more to Chorley Nissan Wigan (Nissan UK Dealer Network)?
Chorley Group Wigan Nissan (Alfapower) is 0.1 miles away in a straight line, with up to 50 kW. Check its live status before you set off.
How long does a Tesla Model Y Long Range take to charge at Chorley Nissan Wigan (Nissan UK Dealer Network)?
A 10–80% charge takes about 7h 54m on the 7 kW Type 2 here, adding roughly 55 kWh. Estimates assume a typical charge curve and a warm battery.
How long does a Tesla Model 3 Rear-Wheel Drive take to charge at Chorley Nissan Wigan (Nissan UK Dealer Network)?
A 10–80% charge takes about 5h 42m on the 7 kW Type 2 here, adding roughly 40 kWh. Estimates assume a typical charge curve and a warm battery.
How long does an Audi Q4 e-tron 50 take to charge at Chorley Nissan Wigan (Nissan UK Dealer Network)?
A 10–80% charge takes about 7h 18m on the 7 kW Type 2 here, adding roughly 51 kWh. Estimates assume a typical charge curve and a warm battery.
Chargers near this site
- Chorley Group Wigan Nissan
- Loire Drive - Wigan
- Mona Street Pay & Display
- Pod Point One Stop - Cornwallis Road
- Harrogate Street
- Pod Point Heron Foods
- Cheapest nearby
- Pod Point One Stop - Cornwallis Road · 26.4p per kWh · 7 kW · 0.6 mi