Amp Map is in beta - data and features are still being developed. Any feedback is appreciated.Amp Map is in beta. Send feedback

Be.EV · EV charging site

Loire Drive - Wigan

Loire Drive, Wigan, WN5 0UH

Loire Drive - Wigan is an EV charging site in Wigan, Borough of Wigan, run by Be.EV and open 24 hours a day. Its 3 sockets reach up to 50 kW, with CCS and CHAdeMO at the top speed, and published prices run from £0.59 to £0.77 per kWh. Amp Map measured 0% uptime here over the last 30 days. 11 other charging sites are listed within a mile, and the nearest other site with 50 kW or more is Robin Park Car Park, Wigan (Osprey Charging), 0.3 miles away.

Status

Out of service

Checking status…

VerifiedLive status and details from Be.EV’s data feed. Amp Map updates them automatically.Last synced 21 Nov 2026

Connectors

CCS · 50 kW1 connector · 77p per kWhOut of service
BVRGM0001-10% reliabilityOut of order
CHAdeMO · 50 kW1 connector · 77p per kWhOut of service
BVRGM0001-20% reliabilityOut of order
Type 2 · 11 kW1 connector · 59p per kWhOut of service
BVRGM0001-30% reliabilityOut of order

Reliability is the share of time each socket was not out of order, over the last 30 days.

Site information

Operator
Be.EV
Opening hours
Open 24 hours
Parking
Car park
Payment
In the Be.EV appRFID card
Charger ID
BVRGM0001-1

Always check directly with the charge point operator for the most up-to-date information.

Prices

ConnectorPowerPrice
CCS50 kW77p per kWh
CHAdeMO50 kW77p per kWh
Type 211 kW59p per kWh

Price at the charger, including VAT. Paying in the operator's app may cost less.

Charge times by car

Charge window10–80%
Tesla Model Y Long Range 10–80% · 50 kW CCS~70 min · ≈ 55 kWh · ~£43
Tesla Model 3 Rear-Wheel Drive 10–80% · 50 kW CCS~50 min · ≈ 40 kWh · ~£31
Audi Q4 e-tron 50 10–80% · 50 kW CCS~66 min · ≈ 51 kWh · ~£39
Hyundai IONIQ 5 10–80% · 50 kW CCS~64 min · ≈ 51 kWh · ~£39
MG Motor MG4 Trophy 10–80% · 50 kW CCS~55 min · ≈ 43 kWh · ~£33
Hyundai Kona Electric Long Range 10–80% · 50 kW CCS~55 min · ≈ 41 kWh · ~£31
Nissan LEAF 10–80% · 50 kW CHAdeMO~55 min · ≈ 28 kWh · ~£22

Estimates assume a typical charge curve and a warm battery.

Reviews

No reviews yet. Be the first to rate this charger.

Rate this charger

Common questions

How much does it cost to charge at Loire Drive - Wigan (Be.EV)?

The listed price is CCS £0.77/kWh · CHAdeMO £0.77/kWh · Type 2 £0.59/kWh. Prices can change, so check the price at the charger before you start.

How fast is charging at Loire Drive - Wigan (Be.EV)?

Up to 50 kW DC via CCS, CHAdeMO, Type 2.

How many charging sockets does Loire Drive - Wigan (Be.EV) have?

3 charging sockets: 1 × 50 kW CCS, 1 × 50 kW CHAdeMO, 1 × 11 kW Type 2. Live per-socket availability is shown on this page.

Is Loire Drive - Wigan (Be.EV) open 24/7?

Yes - Loire Drive - Wigan (Be.EV) is open 24 hours a day, 7 days a week.

How reliable is Loire Drive - Wigan (Be.EV)?

Amp Map measured 0% uptime here from recorded live status over the last 30 days.

Who operates Loire Drive - Wigan?

Loire Drive - Wigan is on the Be.EV network.

Where is the nearest other charger with 50 kW or more to Loire Drive - Wigan (Be.EV)?

Robin Park Car Park, Wigan (Osprey Charging) is 0.3 miles away in a straight line, with up to 300 kW. Check its live status before you set off.

How long does a Tesla Model Y Long Range take to charge at Loire Drive - Wigan (Be.EV)?

A typical 10–80% rapid charge takes about 70 min on the 50 kW CCS here, adding roughly 55 kWh (~£43 at the published price). Estimates assume a typical charge curve and a warm battery.

How long does a Tesla Model 3 Rear-Wheel Drive take to charge at Loire Drive - Wigan (Be.EV)?

A typical 10–80% rapid charge takes about 50 min on the 50 kW CCS here, adding roughly 40 kWh (~£31 at the published price). Estimates assume a typical charge curve and a warm battery.

How long does an Audi Q4 e-tron 50 take to charge at Loire Drive - Wigan (Be.EV)?

A typical 10–80% rapid charge takes about 66 min on the 50 kW CCS here, adding roughly 51 kWh (~£39 at the published price). Estimates assume a typical charge curve and a warm battery.

Data: Be.EV · synced 21 Nov 2026

Amp Map does not take payment. You pay the operator.