Amp Map is in beta - data and features are still being developed. Any feedback is appreciated.Amp Map is in beta. Send feedback

Be.EV · EV charging site

Hulme Retail Park

Greenheys Lane Way, Hulme, Manchester City Centre, M15 5JR

Hulme Retail Park is an EV charging site in Manchester City Centre, Manchester, run by Be.EV and open 24 hours a day. All 6 of its sockets are 150 kW CCS, and the published price is £0.89 per kWh. Recorded live status shows it is usually busiest around noon, and Amp Map measured 99% uptime and recorded 1810 charging sessions here over the last 30 days. 13 other charging sites are listed within a mile, and the nearest other site with 50 kW or more is MMU Birley Fields (Be.EV), 0.2 miles away.

Status

3 of 6 available

Checking status…

VerifiedLive status and details from Be.EV’s data feed. Amp Map updates them automatically.Last synced 20 Nov 2026

Connectors

CCS · 150 kW6 connectors · 89p per kWh3 free3 in use
BEEVU0029-199% reliabilityCharging
BEEVU0029-299% reliabilityCharging
BEEVU0030-1100% reliabilityAvailable
BEEVU0030-2100% reliabilityAvailable
BEEVU0031-1100% reliabilityCharging
BEEVU0031-299% reliabilityAvailable

Reliability is the share of time each socket was not out of order, over the last 30 days.

Site information

Operator
Be.EV
Opening hours
Open 24 hours
Parking
Car park
Payment
Contactless card at the chargerIn the Be.EV appRFID card
Charger ID
BEEVU0029-1
Bays
Must stay plugged in while parked

Always check directly with the charge point operator for the most up-to-date information.

Prices

ConnectorPowerPrice
CCS150 kW89p per kWh

Price at the charger, including VAT. Paying in the operator's app may cost less.

Charge times by car

Charge window10–80%
Tesla Model Y Long Range 10–80% · 150 kW CCS~27 min · ≈ 55 kWh · ~£49
Tesla Model 3 Rear-Wheel Drive 10–80% · 150 kW CCS~24 min · ≈ 40 kWh · ~£36
Audi Q4 e-tron 50 10–80% · 150 kW CCS~39 min · ≈ 51 kWh · ~£45
Hyundai IONIQ 5 10–80% · 150 kW CCS~23 min · ≈ 51 kWh · ~£45
MG Motor MG4 Trophy 10–80% · 150 kW CCS~30 min · ≈ 43 kWh · ~£38
Hyundai Kona Electric Long Range 10–80% · 150 kW CCS~39 min · ≈ 41 kWh · ~£36

Estimates assume a typical charge curve and a warm battery.

Reviews

No reviews yet. Be the first to rate this charger.

Rate this charger

Common questions

How much does it cost to charge at Hulme Retail Park (Be.EV)?

The listed price is £0.89/kWh. Prices can change, so check the price at the charger before you start.

How fast is charging at Hulme Retail Park (Be.EV)?

Up to 150 kW DC via CCS.

How many charging sockets does Hulme Retail Park (Be.EV) have?

6 charging sockets: 6 × 150 kW CCS. Live per-socket availability is shown on this page.

Is Hulme Retail Park (Be.EV) open 24/7?

Yes - Hulme Retail Park (Be.EV) is open 24 hours a day, 7 days a week.

When is Hulme Retail Park (Be.EV) busiest?

Measured from recorded socket occupancy across the week, it is typically busiest around noon and quietest around 6 am. The live status on this page shows what is free before you set off.

How reliable is Hulme Retail Park (Be.EV)?

Amp Map measured 99% uptime here from recorded live status over the last 30 days, across 1810 observed charging sessions.

Who operates Hulme Retail Park?

Hulme Retail Park is on the Be.EV network.

Where is the nearest other charger with 50 kW or more to Hulme Retail Park (Be.EV)?

MMU Birley Fields (Be.EV) is 0.2 miles away in a straight line, with up to 50 kW. Check its live status before you set off.

How long does a Tesla Model Y Long Range take to charge at Hulme Retail Park (Be.EV)?

A typical 10–80% rapid charge takes about 27 min on the 150 kW CCS here, adding roughly 55 kWh (~£49 at the published price). Estimates assume a typical charge curve and a warm battery.

How long does a Tesla Model 3 Rear-Wheel Drive take to charge at Hulme Retail Park (Be.EV)?

A typical 10–80% rapid charge takes about 24 min on the 150 kW CCS here, adding roughly 40 kWh (~£36 at the published price). Estimates assume a typical charge curve and a warm battery.

How long does an Audi Q4 e-tron 50 take to charge at Hulme Retail Park (Be.EV)?

A typical 10–80% rapid charge takes about 39 min on the 150 kW CCS here, adding roughly 51 kWh (~£45 at the published price). Estimates assume a typical charge curve and a warm battery.

Data: Be.EV · synced 20 Nov 2026

Amp Map does not take payment. You pay the operator.