Amp Map is in beta - data and features are still being developed. Any feedback is appreciated.Amp Map is in beta. Send feedback

Be.EV · EV charging site

IMO Batley

Bradford Road, Batley, WF17 8LP

IMO Batley is an EV charging site in Batley, Kirklees, run by Be.EV and open 24 hours a day. Its 5 sockets reach up to 150 kW, with CCS at the top speed, and published prices run from £0.59 to £0.89 per kWh. Recorded live status shows it is usually busiest around 2 pm, and Amp Map measured 99% uptime and recorded 442 charging sessions here over the last 30 days. 3 other charging sites are listed within a mile, and the nearest other site with 50 kW or more is Henrietta Street (GeniePoint), 0.3 miles away.

Status

4 of 5 available

Checking status…

VerifiedLive status and details from Be.EV’s data feed. Amp Map updates them automatically.Last synced 21 Nov 2026

Connectors

CCS · 150 kW2 connectors · 89p per kWh1 free1 in use
BEEVU0003-1100% reliabilityCharging
BEEVU0003-2100% reliabilityAvailable
CCS · 51 kW1 connector · 84p per kWh1 free
BEEVR0027-199% reliabilityAvailable
CHAdeMO · 51 kW1 connector · 84p per kWh1 free
BEEVR0027-294% reliabilityAvailable
Type 2 · 22 kW1 connector · 59p per kWh1 free
BEEVR0027-3100% reliabilityAvailable

Reliability is the share of time each socket was not out of order, over the last 30 days.

Site information

Operator
Be.EV
Opening hours
Open 24 hours
Parking
Car park
Payment
Contactless card at the chargerIn the Be.EV appRFID card
Charger ID
BEEVR0027-1
Bays
Must stay plugged in while parked

Always check directly with the charge point operator for the most up-to-date information.

Prices

ConnectorPowerPrice
CCS150 kW89p per kWh
CCS51 kW84p per kWh
CHAdeMO51 kW84p per kWh
Type 222 kW59p per kWh

Price at the charger, including VAT. Paying in the operator's app may cost less.

Charge times by car

Charge window10–80%
Tesla Model Y Long Range 10–80% · 150 kW CCS~27 min · ≈ 55 kWh · ~£49
Tesla Model 3 Rear-Wheel Drive 10–80% · 150 kW CCS~24 min · ≈ 40 kWh · ~£36
Audi Q4 e-tron 50 10–80% · 150 kW CCS~39 min · ≈ 51 kWh · ~£45
Hyundai IONIQ 5 10–80% · 150 kW CCS~23 min · ≈ 51 kWh · ~£45
MG Motor MG4 Trophy 10–80% · 150 kW CCS~30 min · ≈ 43 kWh · ~£38
Hyundai Kona Electric Long Range 10–80% · 150 kW CCS~39 min · ≈ 41 kWh · ~£36
Nissan LEAF 10–80% · 51 kW CHAdeMO~54 min · ≈ 28 kWh · ~£24

Estimates assume a typical charge curve and a warm battery.

Reviews

No reviews yet. Be the first to rate this charger.

Rate this charger

Common questions

How much does it cost to charge at IMO Batley (Be.EV)?

The listed price is CCS £0.84/kWh · CHAdeMO £0.84/kWh · Type 2 £0.59/kWh · CCS £0.89/kWh. Prices can change, so check the price at the charger before you start.

How fast is charging at IMO Batley (Be.EV)?

Up to 150 kW DC via CCS, CHAdeMO, Type 2.

How many charging sockets does IMO Batley (Be.EV) have?

5 charging sockets: 1 × 51 kW CCS, 1 × 51 kW CHAdeMO, 1 × 22 kW Type 2, 2 × 150 kW CCS. Live per-socket availability is shown on this page.

Is IMO Batley (Be.EV) open 24/7?

Yes - IMO Batley (Be.EV) is open 24 hours a day, 7 days a week.

When is IMO Batley (Be.EV) busiest?

Measured from recorded socket occupancy across the week, it is typically busiest around 2 pm and quietest around 11 pm. The live status on this page shows what is free before you set off.

How reliable is IMO Batley (Be.EV)?

Amp Map measured 99% uptime here from recorded live status over the last 30 days, across 442 observed charging sessions.

Who operates IMO Batley?

IMO Batley is on the Be.EV network.

Where is the nearest other charger with 50 kW or more to IMO Batley (Be.EV)?

Henrietta Street (GeniePoint) is 0.3 miles away in a straight line, with up to 50 kW. Check its live status before you set off.

How long does a Tesla Model Y Long Range take to charge at IMO Batley (Be.EV)?

A typical 10–80% rapid charge takes about 27 min on the 150 kW CCS here, adding roughly 55 kWh (~£49 at the published price). Estimates assume a typical charge curve and a warm battery.

How long does a Tesla Model 3 Rear-Wheel Drive take to charge at IMO Batley (Be.EV)?

A typical 10–80% rapid charge takes about 24 min on the 150 kW CCS here, adding roughly 40 kWh (~£36 at the published price). Estimates assume a typical charge curve and a warm battery.

How long does an Audi Q4 e-tron 50 take to charge at IMO Batley (Be.EV)?

A typical 10–80% rapid charge takes about 39 min on the 150 kW CCS here, adding roughly 51 kWh (~£45 at the published price). Estimates assume a typical charge curve and a warm battery.

Data: Be.EV · synced 21 Nov 2026

Amp Map does not take payment. You pay the operator.