Zero Carbon World · EV charging site
Healey House Hotel
Towngate Road, Batley, WF17 7HR
Healey House Hotel is an EV charging site in Batley, Kirklees, run by Zero Carbon World. It has a single 7 kW Type 2 socket, and charging is listed as free. 6 other charging sites are listed within a mile, and the nearest site with 50 kW or more is IMO Batley (Be.EV), 0.5 miles away.
Status
No live status
We don't have live status for this charger. Check it when you arrive.
Connectors
Site information
- Operator
- Zero Carbon World
- Opening hours
- Not published
- Access
- Public
- Payment
- Pay at the charger (from Open Charge Map)
- Price
- Free(from Open Charge Map, 19 Feb 2015)
- Phone (from Open Charge Map)
- 01924 444777
- Getting there
- Previously known as Alder House Hotel
- Find it
- Street View of this spot ↗
Facilities
Always check directly with the charge point operator for the most up-to-date information.
Reviews
No reviews yet. Be the first to rate this charger.
Common questions
How much does it cost to charge at Healey House Hotel (Zero Carbon World)?
The listed price is Free. Prices can change, so check the price at the charger before you start.
How fast is charging at Healey House Hotel (Zero Carbon World)?
Up to 7 kW AC via Type 2.
How many charging sockets does Healey House Hotel (Zero Carbon World) have?
1 charging socket: 1 × 7 kW Type 2.
Who operates Healey House Hotel?
Healey House Hotel is on the Zero Carbon World network. For site issues, the operator lists 01924 444777.
Where is the nearest charger with 50 kW or more to Healey House Hotel (Zero Carbon World)?
IMO Batley (Be.EV) is 0.5 miles away in a straight line, with up to 150 kW. Check its live status before you set off.
How long does a Tesla Model Y Long Range take to charge at Healey House Hotel (Zero Carbon World)?
A 10–80% charge takes about 7h 54m on the 7 kW Type 2 here, adding roughly 55 kWh. Estimates assume a typical charge curve and a warm battery.
How long does a Tesla Model 3 Rear-Wheel Drive take to charge at Healey House Hotel (Zero Carbon World)?
A 10–80% charge takes about 5h 42m on the 7 kW Type 2 here, adding roughly 40 kWh. Estimates assume a typical charge curve and a warm battery.
How long does an Audi Q4 e-tron 50 take to charge at Healey House Hotel (Zero Carbon World)?
A 10–80% charge takes about 7h 18m on the 7 kW Type 2 here, adding roughly 51 kWh. Estimates assume a typical charge curve and a warm battery.
Chargers near this site
- IMO Batley
- Henrietta Street
- Al-Hikmah Centre
- Pod Point Tesco Extra - Batley
- Dewsbury & District Hospital
- Pod Point Upper Road Car Park
- Cheapest nearby
- Pod Point Upper Road Car Park · 40.8p per kWh · 7 kW · 1 mi
- Fastest nearby
- IMO Batley · 150 kW · 0.5 mi