Amp Map is in beta - data and features are still being developed. Any feedback is appreciated.Amp Map is in beta. Send feedback

Be.EV · EV charging site

Meadway East Car Park

Meadway East Car Park, Bramhall, SK7 1JZ

Meadway East Car Park is an EV charging site in Bramhall, Borough of Stockport, run by Be.EV and open 24 hours a day. Both of its sockets are 7 kW Type 2, and the published price is £0.59 per kWh. Recorded live status shows it is usually busiest around noon, and Amp Map measured 100% uptime and recorded 71 charging sessions here over the last 30 days. No other charging site is listed within a mile, and the nearest site with 50 kW or more is The Aviator (Be.EV), 1 mile away.

Status

2 of 2 available

Checking status…

VerifiedLive status and details from Be.EV’s data feed. Amp Map updates them automatically.Last synced 21 Nov 2026

Connectors

Type 2 · 7 kW2 connectors · 59p per kWh2 free
BVFGM0057-A100% reliabilityAvailable
BVFGM0057-B100% reliabilityAvailable

Reliability is the share of time each socket was not out of order, over the last 30 days.

Site information

Operator
Be.EV
Opening hours
Open 24 hours
Parking
Car park
Payment
In the Be.EV appRFID card
Charger ID
BVFGM0057-A

Facilities

Car park

Always check directly with the charge point operator for the most up-to-date information.

Prices

ConnectorPowerPrice
Type 27 kW59p per kWh

Price at the charger, including VAT. Paying in the operator's app may cost less.

Charge times by car

Charge window10–80%
Tesla Model Y Long Range 10–80% · 7 kW Type 2~7h 54m · ≈ 55 kWh · ~£33
Tesla Model 3 Rear-Wheel Drive 10–80% · 7 kW Type 2~5h 42m · ≈ 40 kWh · ~£24
Audi Q4 e-tron 50 10–80% · 7 kW Type 2~7h 18m · ≈ 51 kWh · ~£30
Hyundai IONIQ 5 10–80% · 7 kW Type 2~7h 16m · ≈ 51 kWh · ~£30
MG Motor MG4 Trophy 10–80% · 7 kW Type 2~6h 6m · ≈ 43 kWh · ~£25
Hyundai Kona Electric Long Range 10–80% · 7 kW Type 2~5h 48m · ≈ 41 kWh · ~£24
Nissan LEAF 10–80% · 7 kW Type 2~4h 15m · ≈ 28 kWh · ~£17

Estimates assume a typical charge curve and a warm battery.

Reviews

No reviews yet. Be the first to rate this charger.

Rate this charger

Common questions

How much does it cost to charge at Meadway East Car Park (Be.EV)?

The listed price is £0.59/kWh. Prices can change, so check the price at the charger before you start.

How fast is charging at Meadway East Car Park (Be.EV)?

Up to 7 kW AC via Type 2.

How many charging sockets does Meadway East Car Park (Be.EV) have?

2 charging sockets: 2 × 7 kW Type 2. Live per-socket availability is shown on this page.

Is Meadway East Car Park (Be.EV) open 24/7?

Yes - Meadway East Car Park (Be.EV) is open 24 hours a day, 7 days a week.

When is Meadway East Car Park (Be.EV) busiest?

Measured from recorded socket occupancy across the week, it is typically busiest around noon and quietest around 6 am. The live status on this page shows what is free before you set off.

How reliable is Meadway East Car Park (Be.EV)?

Amp Map measured 100% uptime here from recorded live status over the last 30 days, across 71 observed charging sessions.

Who operates Meadway East Car Park?

Meadway East Car Park is on the Be.EV network.

Where is the nearest charger with 50 kW or more to Meadway East Car Park (Be.EV)?

The Aviator (Be.EV) is 1 mile away in a straight line, with up to 150 kW. Check its live status before you set off.

How long does a Tesla Model Y Long Range take to charge at Meadway East Car Park (Be.EV)?

A 10–80% charge takes about 7h 54m on the 7 kW Type 2 here, adding roughly 55 kWh (~£33 at the published price). Estimates assume a typical charge curve and a warm battery.

How long does a Tesla Model 3 Rear-Wheel Drive take to charge at Meadway East Car Park (Be.EV)?

A 10–80% charge takes about 5h 42m on the 7 kW Type 2 here, adding roughly 40 kWh (~£24 at the published price). Estimates assume a typical charge curve and a warm battery.

How long does an Audi Q4 e-tron 50 take to charge at Meadway East Car Park (Be.EV)?

A 10–80% charge takes about 7h 18m on the 7 kW Type 2 here, adding roughly 51 kWh (~£30 at the published price). Estimates assume a typical charge curve and a warm battery.

Data: Be.EV · synced 21 Nov 2026

Amp Map does not take payment. You pay the operator.