Amp Map is in beta - data and features are still being developed. Any feedback is appreciated.Amp Map is in beta. Send feedback

Be.EV · EV charging site

Woods Lane Car Park

Church Road, Woods Lane, Cheadle Hulme, SK8 7JU

Woods Lane Car Park is an EV charging site in Cheadle Hulme, Borough of Stockport, run by Be.EV and open 24 hours a day. Its 8 sockets reach up to 300 kW, with CCS at the top speed, and published prices run from £0.84 to £0.89 per kWh. Recorded live status shows it is usually busiest around 6 pm, and Amp Map measured 97% uptime and recorded 292 charging sessions here over the last 30 days. 4 other charging sites are listed within a mile, and the nearest other site with 50 kW or more is Cheadle Hulme SF Connect (BP Pulse), 80 yards away.

Status

6 of 8 available

Checking status…

VerifiedLive status and details from Be.EV’s data feed. Amp Map updates them automatically.Last synced 21 Nov 2026

Connectors

CCS · 300 kW4 connectors · 89p per kWh3 free1 in use
BEEV40-2100% reliabilityAvailable
BEEV40-4100% reliabilityAvailable
BEEV40-6100% reliabilityCharging
BEEV40-8100% reliabilityAvailable
CHAdeMO · 50 kW4 connectors · 84p per kWh3 free1 out of service
BEEV40-195% reliabilityAvailable
BEEV40-395% reliabilityAvailable
BEEV40-594% reliabilityOut of order
BEEV40-793% reliabilityAvailable

Reliability is the share of time each socket was not out of order, over the last 30 days.

Site information

Operator
Be.EV
Opening hours
Open 24 hours
Parking
Car park
Payment
Contactless card at the chargerIn the Be.EV appRFID card
Charger ID
BEEV40-1
Bays
Must stay plugged in while parked

Facilities

Car park

Always check directly with the charge point operator for the most up-to-date information.

Prices

ConnectorPowerPrice
CCS300 kW89p per kWh
CHAdeMO50 kW84p per kWh

Price at the charger, including VAT. Paying in the operator's app may cost less.

Charge times by car

Charge window10–80%
Tesla Model Y Long Range 10–80% · 300 kW CCS~21 min · ≈ 55 kWh · ~£49
Tesla Model 3 Rear-Wheel Drive 10–80% · 300 kW CCS~23 min · ≈ 40 kWh · ~£36
Audi Q4 e-tron 50 10–80% · 300 kW CCS~39 min · ≈ 51 kWh · ~£45
Hyundai IONIQ 5 10–80% · 300 kW CCS~18 min · ≈ 51 kWh · ~£45
MG Motor MG4 Trophy 10–80% · 300 kW CCS~30 min · ≈ 43 kWh · ~£38
Hyundai Kona Electric Long Range 10–80% · 300 kW CCS~39 min · ≈ 41 kWh · ~£36
Nissan LEAF 10–80% · 50 kW CHAdeMO~55 min · ≈ 28 kWh · ~£24

Estimates assume a typical charge curve and a warm battery.

Reviews

No reviews yet. Be the first to rate this charger.

Rate this charger

Common questions

How much does it cost to charge at Woods Lane Car Park (Be.EV)?

The listed price is CHAdeMO £0.84/kWh · CCS £0.89/kWh. Prices can change, so check the price at the charger before you start.

How fast is charging at Woods Lane Car Park (Be.EV)?

Up to 300 kW DC via CHAdeMO, CCS.

How many charging sockets does Woods Lane Car Park (Be.EV) have?

8 charging sockets: 4 × 50 kW CHAdeMO, 4 × 300 kW CCS. Live per-socket availability is shown on this page.

Is Woods Lane Car Park (Be.EV) open 24/7?

Yes - Woods Lane Car Park (Be.EV) is open 24 hours a day, 7 days a week.

When is Woods Lane Car Park (Be.EV) busiest?

Measured from recorded socket occupancy across the week, it is typically busiest around 6 pm and quietest around 6 am. The live status on this page shows what is free before you set off.

How reliable is Woods Lane Car Park (Be.EV)?

Amp Map measured 97% uptime here from recorded live status over the last 30 days, across 292 observed charging sessions.

Who operates Woods Lane Car Park?

Woods Lane Car Park is on the Be.EV network.

Where is the nearest other charger with 50 kW or more to Woods Lane Car Park (Be.EV)?

Cheadle Hulme SF Connect (BP Pulse) is 80 yards away in a straight line, with up to 150 kW. Check its live status before you set off.

How long does a Tesla Model Y Long Range take to charge at Woods Lane Car Park (Be.EV)?

A typical 10–80% rapid charge takes about 21 min on the 300 kW CCS here, adding roughly 55 kWh (~£49 at the published price). Estimates assume a typical charge curve and a warm battery.

How long does a Tesla Model 3 Rear-Wheel Drive take to charge at Woods Lane Car Park (Be.EV)?

A typical 10–80% rapid charge takes about 23 min on the 300 kW CCS here, adding roughly 40 kWh (~£36 at the published price). Estimates assume a typical charge curve and a warm battery.

How long does an Audi Q4 e-tron 50 take to charge at Woods Lane Car Park (Be.EV)?

A typical 10–80% rapid charge takes about 39 min on the 300 kW CCS here, adding roughly 51 kWh (~£45 at the published price). Estimates assume a typical charge curve and a warm battery.

Data: Be.EV · synced 21 Nov 2026

Amp Map does not take payment. You pay the operator.